10.04.2013 Views

No. 94-08-19 - City of Frisco

No. 94-08-19 - City of Frisco

No. 94-08-19 - City of Frisco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

17. Size <strong>of</strong> buildings;<br />

18. Computations <strong>of</strong> building area for each occupancy, site area and parking ratio;<br />

<strong>19</strong>.0ther such information as considered essential by the Planning and Zoning Commission<br />

Or<br />

<strong>City</strong> Council;<br />

20. Existing or proposed water and sanitary sewer lines;<br />

21. Sign locations;<br />

22. Minimum finished floor elevation two feet (2') above one-hundred year storm elevation<br />

on<br />

U.S.G.S. datum, when applicable, as well as F.E.M.A. mapping for site.<br />

The <strong>City</strong> may require other information and data for a specific site plan. This data may<br />

include, but is not limited to geologic or archaeological information, water yields, flood data,<br />

environmental information, traffic analysis, road capacities, market information, economic<br />

data for the proposed development, hours <strong>of</strong> operation, elevation and perspective<br />

drawings, lighting, and similar information. Conditional approval <strong>of</strong> the site plan may<br />

establish certain conditions for construction based on such information.<br />

6-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!