Sequence Diagram for Use Case 2<br />

Use Case 3: Maintenance<br />

The third use case addresses the need to perform regular maintenance and inspections on<br />

the plant and ensure the process is operating properly. The maintenance operator should be able<br />

to inspect each reactor and the sensors and piping attached to them. The operator will proceed<br />

with each reactor in sequence and the equipment attached to them. If there is a problem<br />

appropriate actions should be taken to rectify the problem. In the end the time and date <strong>of</strong><br />

maintenance should be documented to verify that everything is working as it should. The number<br />

<strong>of</strong> different possibilities for maintenance issues is too large to comprehensively cover, but the<br />

following scenarios address common/simplified possibilities: