Condair Esco
Condair Esco
Condair Esco
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5.3 Schematic diagram<br />
z<br />
P<br />
S<br />
When Z is larger than 5 m, the pipe must be drained.<br />
P = primary condensate drain:<br />
The primary condensate can be drained, even against pressure, via<br />
built-in condensate drain. The back pressure must not exceed 50 %<br />
of the primary steam pressure.<br />
S = secondary condensate drain:<br />
The secondary condensate must be able to flow without any restrictions.<br />
z<br />
P S<br />
Primary and secondary condensate must be drained separately (unequal<br />
pressure).