05.06.2013 Views

Condair Esco

Condair Esco

Condair Esco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.3 Schematic diagram<br />

z<br />

P<br />

S<br />

When Z is larger than 5 m, the pipe must be drained.<br />

P = primary condensate drain:<br />

The primary condensate can be drained, even against pressure, via<br />

built-in condensate drain. The back pressure must not exceed 50 %<br />

of the primary steam pressure.<br />

S = secondary condensate drain:<br />

The secondary condensate must be able to flow without any restrictions.<br />

z<br />

P S<br />

Primary and secondary condensate must be drained separately (unequal<br />

pressure).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!