- Page 1:
International Search and Rescue Adv
- Page 4 and 5:
Annex I: INSARAG External Classific
- Page 6 and 7:
TABLE OF CONTENTS A PREFACE 1 A1 In
- Page 8 and 9:
F2.4 Operations 38 F2.5 Demobilisat
- Page 10 and 11:
F12.2 Preparedness 86 F12.3 Mobilis
- Page 12 and 13:
INSARAG Guidelines April 2012
- Page 14 and 15:
development of standardized guideli
- Page 16 and 17:
Emphasising the responsibility of a
- Page 18 and 19:
the Guidelines of the International
- Page 20 and 21:
2. Recognizes the increasing and ex
- Page 22 and 23:
10. Calls upon the Member States of
- Page 24 and 25:
USAR team arrives at the Reception
- Page 26 and 27:
B3.4 INSARAG Regional Antennae 1. T
- Page 28 and 29:
3.5 Disseminate information from th
- Page 30 and 31:
2.2.2 The information updates shoul
- Page 32 and 33:
C4 International USAR Teams 1. Urba
- Page 34 and 35:
INSARAG Guidelines April 2012 Page
- Page 36 and 37:
D1.5 Post Mission 1. Perform an ana
- Page 38 and 39:
2. Bear all costs related to intern
- Page 40 and 41:
2. Coordinate its withdrawal with t
- Page 42 and 43:
3. Establish communications link to
- Page 44 and 45:
E USAR TEAM CLASSIFICATION 1. Over
- Page 46 and 47:
International Medium USAR teams tra
- Page 48 and 49:
4. Communication barriers due to la
- Page 50 and 51:
2. Liaise with the team‘s governi
- Page 52 and 53:
3.1 Personnel and equipment rehabil
- Page 54 and 55:
members on the ground. This ensures
- Page 56 and 57:
1.5 Evaluation of the effectiveness
- Page 58 and 59:
6.3 Ensure safety and security proc
- Page 60 and 61:
cooperation, coordination and cultu
- Page 62 and 63:
2.10.2 Ensure proper hand-over is c
- Page 64 and 65:
1.4 All personnel check in with the
- Page 66 and 67:
F5.8 Return to Home Base 1. On the
- Page 68 and 69:
and media representatives on site,
- Page 70 and 71:
1.5 Allow easy access to transporta
- Page 72 and 73:
F8.7 Base of Operations Layout INSA
- Page 74 and 75:
F9.3 Operations 1. USAR teams are r
- Page 76 and 77:
3. Canine and Technical search comp
- Page 78 and 79:
carry out its tasks and responsibil
- Page 80 and 81:
2. It should also be noted that the
- Page 82 and 83:
procedure should not be performed b
- Page 84 and 85:
1.2.1.1 Serious illness, injury or
- Page 86 and 87:
medical care, if required. If the U
- Page 88 and 89:
3.2.2 Provide simultaneous immediat
- Page 90 and 91:
1.4.3 The screening process should
- Page 92 and 93:
F11.5 Operations 1. Medical Managem
- Page 94 and 95:
1.3.7.2 Fatigue; 1.3.7.3 General st
- Page 96 and 97:
3.3.2 Member/s of the USAR medical
- Page 98 and 99:
1.1.3 Report on the operational rea
- Page 100 and 101:
2.1. Lack of necessary transport or
- Page 102 and 103:
Access are postponed until addition
- Page 104 and 105:
8.1 For safe penetration into the s
- Page 106 and 107:
1.2 Interior Identification: 1.2.1
- Page 108 and 109:
3.3 Team identification; 3.4 Date a
- Page 110 and 111:
Reference point - triangle Time den
- Page 112 and 113:
LEMA, OSOCC and other relevant acto
- Page 114 and 115:
G ESTABLISHING A NATIONAL URBAN SEA
- Page 116 and 117:
primary role in the initiation, org
- Page 118 and 119:
G3 INSARAG Operational and Organisa
- Page 120 and 121:
Any external confirmation of achiev
- Page 122 and 123:
The majority of people rescued afte
- Page 124 and 125:
2. The ―Light‖ Team structure i
- Page 126 and 127:
Engineer Safety & Security Safety O
- Page 128 and 129: The ability to physically operate a
- Page 130 and 131: Food supply Logistician 1 Transport
- Page 132 and 133: A USAR First Responder Training of
- Page 134 and 135: 3. Not all teams will contain all i
- Page 136 and 137: G10 INSARAG Organisational and Oper
- Page 138 and 139: 7.2.1. Other USAR teams, including
- Page 140 and 141: 10.3. The national USAR team manage
- Page 142 and 143: 15. Search Operations * For Medium
- Page 144 and 145: Mechanical 20 metric tons(M/T) 12 m
- Page 146 and 147: H INSARAG EXTERNAL CLASSIFICATION G
- Page 148 and 149: neighbouring countries. It is norma
- Page 150 and 151: Any independent organisation that o
- Page 152 and 153: combination thereof, which has the
- Page 154 and 155: and rescue operations phase will be
- Page 156 and 157: Team‘s portfolio and a site visit
- Page 158 and 159: its support framework that may fund
- Page 160 and 161: Preparedness 1. INSARAG Focal Point
- Page 162 and 163: 5.2. Does the USAR team have suffic
- Page 164 and 165: 8.1.3. Passport photos x 6 8.1.4. P
- Page 166 and 167: 9.5. Has the USAR team taken action
- Page 168 and 169: to track personnel at all times? 12
- Page 170 and 171: Concrete columns and beams 450mm 30
- Page 172 and 173: 16.3. Does the USAR team have a pro
- Page 174 and 175: The INSARAG Secretariat will confir
- Page 176 and 177: A green box with a ‗Y‘ (represe
- Page 180 and 181: level? 6.5. Are USAR team and perso
- Page 182 and 183: 8.3.5. Safety and security 8.3.6. L
- Page 184 and 185: 11.1. Does the USAR team have train
- Page 186 and 187: 14.4. Can the search dog* teams loc
- Page 188 and 189: structural elements as follows: 15.
- Page 190 and 191: ANNEXES ANNEX A: INSARAG AWARENESS
- Page 192 and 193: ANNEX B: INSARAG Regional USAR Eart
- Page 194 and 195: as appropriate (UN, NGOs, media, mi
- Page 196 and 197: 1. Pre-exercise preparation by the
- Page 198 and 199: 4. 4 USAR experts selected to facil
- Page 200 and 201: ANNEX C: OSOCC PLANNING FORM INCIDE
- Page 202 and 203: ANNEX E: USAR TEAM POST MISSION REP
- Page 204 and 205: ANNEX G: MISSION SUMMARY REPORT To
- Page 206 and 207: 2.4 Do not go off the record. Anyth
- Page 208 and 209: Medical equipment: Stocked First A
- Page 210 and 211: Shoring equipment: Stock lumber /
- Page 212 and 213: ANNEX J: AIRCRAFT CAPACITY Note: Th
- Page 214 and 215: Boeing H 47 Chinook Jet 130 12,210/
- Page 216 and 217: SOP Standard Operating Procedure TO