11.06.2013 Views

INSARAG_Guidelines-2012_ENG-_Read_version

INSARAG_Guidelines-2012_ENG-_Read_version

INSARAG_Guidelines-2012_ENG-_Read_version

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

D2.2 Mobilisation<br />

1. When required, make the request for international assistance as soon as<br />

possible. Requests for international assistance can be directed through<br />

various channels, namely through UN OCHA, other regional networks, or on a<br />

bilateral basis;<br />

2. Include in the national disaster plan the establishment of LEMA and<br />

deployment of domestic USAR teams;<br />

3. Establish a RDC;<br />

4. Conduct immediate situation and needs assessments. The priority needs of<br />

international assistance should be identified and the information passed to the<br />

international community as soon as possible through UN OCHA and the VO;<br />

5. Provide regular situation updates on the VO;<br />

6. Communicate the cessation of the need for additional USAR teams.<br />

D2.3 Operations<br />

1. Establish a LEMA to manage the disaster;<br />

2. Maintain representation at the RDC and the OSOCC to ensure a coordinated<br />

response and national priorities are met;<br />

3. Utilise international coordination mechanisms provided by UNDAC Teams,<br />

RDC and OSOCC structures;<br />

4. Prepare mechanisms to integrate international USAR teams into ongoing<br />

national operations.<br />

D2.4 Demobilisation<br />

1. Declare the end of the USAR operations phase;<br />

2. Provide logistical support to assist the withdrawal of international teams.<br />

3. Facilitate (as required) USAR teams transition into other humanitarian<br />

operations ―beyond the rubble‖;<br />

4. Facilitate in-kind donation of USAR team equipment left for the affected<br />

government;<br />

D3 Assisting Country Responsibilities<br />

D3.1 Preparedness<br />

1. Implement and maintain procedures to ensure access to transport for rapid<br />

deployment of USAR teams;<br />

<strong>INSARAG</strong> <strong>Guidelines</strong> April <strong>2012</strong><br />

Page 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!