- Page 1 and 2: www.ricerchetrasporti.com IDENTIFIC
- Page 3 and 4: BiPRO Table of Content Abbreviation
- Page 5 and 6: BiPRO 8.1 Overview on suggested mea
- Page 7 and 8: BiPRO Abbreviations AOX Halogenated
- Page 9 and 10: BiPRO PCB Polychlorinated Biphenyls
- Page 11 and 12: BiPRO The investigation showed that
- Page 13 and 14: BiPRO Planning for review of existi
- Page 15: BiPRO remained that could be taken
- Page 19 and 20: BiPRO 2 Background and Objectives A
- Page 21 and 22: BiPRO The main objectives of the Re
- Page 23 and 24: BiPRO 3 Structure and Methodology T
- Page 25 and 26: BiPRO 15. Paper and pulp 16. Refine
- Page 27 and 28: BiPRO Also the attribute local is r
- Page 29 and 30: BiPRO First results on sectorial co
- Page 31 and 32: BiPRO According to common practise
- Page 33 and 34: BiPRO The principal methodology for
- Page 35 and 36: BiPRO Overall assessment Deficits i
- Page 37 and 38: BiPRO As a detailed impact assessme
- Page 39 and 40: BiPRO As shown in the table above i
- Page 41 and 42: BiPRO The suggestions have been dif
- Page 43 and 44: BiPRO Category 3: Effectiveness hig
- Page 45 and 46: BiPRO 3.6 Summary and Overview on s
- Page 47 and 48: BiPRO emissions from other sub-acti
- Page 49 and 50: BiPRO Further, feedback was provide
- Page 51 and 52: BiPRO Slovak republic overall No ne
- Page 53 and 54: BiPRO Since then this list has gene
- Page 55 and 56: BiPRO POP substance (CAS-N) HxBB (H
- Page 57 and 58: BiPRO Polycyclic aromatic hydrocarb
- Page 59 and 60: BiPRO and illustrate the dimension
- Page 61 and 62: BiPRO 5.4.1 Releases to Air The fol
- Page 63 and 64: BiPRO Data basis and uncertainty as
- Page 65 and 66: BiPRO 5.4.2 Releases to Waste The f
- Page 67 and 68:
BiPRO Data basis and uncertainty as
- Page 69 and 70:
BiPRO remaining amount. This issue
- Page 71 and 72:
BiPRO Further information on uncert
- Page 73 and 74:
BiPRO 5.6 Unintentionally produced
- Page 75 and 76:
BiPRO The following figure presents
- Page 77 and 78:
BiPRO Data basis and uncertainty as
- Page 79 and 80:
BiPRO Air emissions seem to be domi
- Page 81 and 82:
BiPRO Further information on uncert
- Page 83 and 84:
BiPRO Results on sectorial contribu
- Page 85 and 86:
BiPRO 6 Inventory of provisions and
- Page 87 and 88:
BiPRO With respect to releases from
- Page 89 and 90:
BiPRO Measures overview 1 Existing
- Page 91 and 92:
BiPRO Measures overview 1.10 Direct
- Page 93 and 94:
BiPRO Measures overview 1.17 79/117
- Page 95 and 96:
BiPRO Measures overview current leg
- Page 97 and 98:
BiPRO Measures overview 3.2 Themati
- Page 99 and 100:
BiPRO Measures overview Guidelines
- Page 101 and 102:
BiPRO Measures overview 4.9 Introdu
- Page 103 and 104:
BiPRO Measures overview 4.20 Introd
- Page 105 and 106:
BiPRO Measures overview 6.1 POP Reg
- Page 107 and 108:
BiPRO Measures overview 6.9 Communi
- Page 109 and 110:
BiPRO Measures overview 6.20 Traini
- Page 111 and 112:
BiPRO Measures overview produced wi
- Page 113 and 114:
BiPRO Measures overview EU HE OS AT
- Page 115 and 116:
BiPRO Measures overview wastes incl
- Page 117 and 118:
BiPRO Relevant legal document Pollu
- Page 119 and 120:
BiPRO 4.3 Measures overview IPPC Di
- Page 121 and 122:
BiPRO Measures Details 1.3 Directiv
- Page 123 and 124:
BiPRO Measures Details content in w
- Page 125 and 126:
BiPRO Measures Details 1.19 396/200
- Page 127 and 128:
BiPRO Measures Details 2 Planned re
- Page 129 and 130:
BiPRO Measures Details 3.2 Thematic
- Page 131 and 132:
BiPRO Measures Details 4.3 5th Surv
- Page 133 and 134:
BiPRO Measures Details 4.14 Develop
- Page 135 and 136:
BiPRO Measures Details 5.3 Promotio
- Page 137 and 138:
BiPRO Measures Details 6.6 Public i
- Page 139 and 140:
BiPRO Measures Details 6.18 Awarene
- Page 141 and 142:
BiPRO Measures Details 8.5 Research
- Page 143 and 144:
BiPRO Measures Details 9.11 Partici
- Page 145 and 146:
BiPRO 7 Gaps and deficits in relati
- Page 147 and 148:
BiPRO As regards gaps and deficits
- Page 149 and 150:
BiPRO The combination of mass flow
- Page 151 and 152:
BiPRO Overall assessment Deficits i
- Page 153 and 154:
BiPRO Overall assessment Deficits i
- Page 155 and 156:
BiPRO Overall assessment Deficits i
- Page 157 and 158:
BiPRO Measures Measure Status Effec
- Page 159 and 160:
BiPRO Overall assessment Deficits i
- Page 161 and 162:
BiPRO 7.2.6 Crematoria and animal c
- Page 163 and 164:
BiPRO 7.2.7 Dredging, Off-shore act
- Page 165 and 166:
BiPRO 7.2.8 Iron and steel Based on
- Page 167 and 168:
BiPRO Measures for filling knowledg
- Page 169 and 170:
BiPRO Overall assessment Deficits i
- Page 171 and 172:
BiPRO 7.2.10 Marine transport Based
- Page 173 and 174:
BiPRO 7.2.11 Mineral industry Based
- Page 175 and 176:
BiPRO 7.2.12 Non-ferrous metal indu
- Page 177 and 178:
BiPRO 7.2.13 Open burning of waste
- Page 179 and 180:
BiPRO 7.2.14 Pesticide use Based on
- Page 181 and 182:
BiPRO General measures for release
- Page 183 and 184:
BiPRO 7.2.15 Power production Based
- Page 185 and 186:
BiPRO 7.2.16 Pulp and paper industr
- Page 187 and 188:
BiPRO 7.2.17 Refinery Based on repo
- Page 189 and 190:
BiPRO 7.2.18 Residential combustion
- Page 191 and 192:
BiPRO 7.2.19 Road transport Based o
- Page 193 and 194:
BiPRO 7.2.20 Shredder industry Base
- Page 195 and 196:
BiPRO 7.2.21 Surface treatment and
- Page 197 and 198:
BiPRO 7.2.22 Waste incineration Bas
- Page 199 and 200:
BiPRO General measures for release
- Page 201 and 202:
BiPRO Overall assessment Deficits i
- Page 203 and 204:
BiPRO N um ber of m easures 120 100
- Page 205 and 206:
BiPRO In the context of this projec
- Page 207 and 208:
BiPRO For the criterion costs the a
- Page 209 and 210:
BiPRO For the criterion feasibility
- Page 211 and 212:
BiPRO 8.3 Detailed results and list
- Page 213 and 214:
BiPRO 1.6 Research on releases from
- Page 215 and 216:
BiPRO Justification of the assessme
- Page 217 and 218:
BiPRO Measures for filling knowledg
- Page 219 and 220:
BiPRO Measures for filling knowledg
- Page 221 and 222:
BiPRO General measures for release
- Page 223 and 224:
BiPRO Proposed Measures Specific me
- Page 225 and 226:
BiPRO Proposed Measures Specific me
- Page 227 and 228:
BiPRO taken into account at least f
- Page 229 and 230:
BiPRO Measures for filling knowledg
- Page 231 and 232:
BiPRO Measures for filling data gap
- Page 233 and 234:
BiPRO Proposed Measures Measure EU
- Page 235 and 236:
BiPRO Measures 10.7 and 10.8 aim to
- Page 237 and 238:
BiPRO a limited mass flow relevance
- Page 239 and 240:
BiPRO Measures 13.2 and 13.4 aim to
- Page 241 and 242:
BiPRO estimated in the same range a
- Page 243 and 244:
BiPRO feasibility of this measure i
- Page 245 and 246:
BiPRO use of molecular chlorine has
- Page 247 and 248:
BiPRO This measure would directly a
- Page 249 and 250:
BiPRO Measures for filling knowledg
- Page 251 and 252:
BiPRO Effectiveness and feasibility
- Page 253 and 254:
BiPRO Justification of the assessme
- Page 255 and 256:
BiPRO Measures for filling knowledg
- Page 257 and 258:
BiPRO Justification of the assessme
- Page 259 and 260:
BiPRO 23. Wood preservation Exposur
- Page 261 and 262:
BiPRO O.6 Information request on ef
- Page 263 and 264:
BiPRO O.23 Updating of and informat
- Page 265 and 266:
BiPRO but socio-economic impacts wo
- Page 267 and 268:
BiPRO medium since administrative s
- Page 269 and 270:
BiPRO impacts can be seen as low as
- Page 271 and 272:
BiPRO I.13 Research in process tech
- Page 273 and 274:
BiPRO However, realisation of the m
- Page 275 and 276:
BiPRO 9 Ranking and prioritisation
- Page 277 and 278:
BiPRO Nr Measure Guidance for asses
- Page 279 and 280:
BiPRO Nr Measure Effectiveness Mari
- Page 281 and 282:
BiPRO Category 5: Effectiveness hig
- Page 283 and 284:
BiPRO Nr Measure Effectiveness Pape
- Page 285 and 286:
BiPRO Nr Measure Effectiveness Cost
- Page 287 and 288:
BiPRO Nr Measure Effectiveness Cost
- Page 289 and 290:
BiPRO Nr Category 1 Measure Pros fo
- Page 291 and 292:
BiPRO Nr Category 2 Measure Researc
- Page 293 and 294:
BiPRO Nr Category 2 Measure Pros fo
- Page 295 and 296:
BiPRO Nr Category 3 Measure Pros fo
- Page 297 and 298:
BiPRO Nr Category 4 Measure Pros fo
- Page 299 and 300:
BiPRO Nr Category 5 Measure Pros fo
- Page 301 and 302:
BiPRO Nr Category 5 Measure Pros fo
- Page 303 and 304:
BiPRO Nr Category 1 Measure Recomme
- Page 305 and 306:
BiPRO Nr Category 2 Measure Recomme
- Page 307 and 308:
BiPRO Nr Category 5 Measure Recomme
- Page 309 and 310:
BiPRO 9.4 Final categorisation base
- Page 311 and 312:
BiPRO Following exclusion of measur
- Page 313 and 314:
BiPRO POP releases could work as fu
- Page 315 and 316:
BiPRO concentrations in solid resid
- Page 317 and 318:
BiPRO Based on an allocation of the
- Page 319 and 320:
BiPRO 11 References AEA Technology,
- Page 321 and 322:
BiPRO European Commission, Communic
- Page 323 and 324:
BiPRO UNEP, Guidelines for the iden
- Page 325 and 326:
BiPRO Table 7-9: Assessment of defi
- Page 327 and 328:
BiPRO List of Figures Figure 3-1: S
- Page 329 and 330:
BiPRO Annex 1 Intention of the ques
- Page 331 and 332:
BiPRO 11.1 Questionnaire Authority
- Page 333 and 334:
BiPRO Insert you answer Information
- Page 335 and 336:
BiPRO 11.2 Questionnaire Industry C
- Page 337 and 338:
BiPRO Insert you answer Information
- Page 339 and 340:
BiPRO Insert you answer Information
- Page 341 and 342:
BiPRO Insert you answer Information
- Page 343 and 344:
BiPRO Contact data for further info
- Page 345 and 346:
BiPRO Source sector PCDD/PCDF PCB H
- Page 347 and 348:
BiPRO Source sector PCDD/PCDF PCB H
- Page 349 and 350:
BiPRO (2) Concentration waste water
- Page 351 and 352:
BiPRO Annex 2 - List of consulted S
- Page 353 and 354:
BiPRO NL NL NL PL SE SK UK UK Mr. J
- Page 355 and 356:
BiPRO LU M. Frank Thewes frank.thew
- Page 357:
BiPRO page 355