- Page 1 and 2:
Unit Strategic Fire Plan Nevada-Yub
- Page 3 and 4:
SIGNATURES Unit Strategic Fire Plan
- Page 5 and 6:
Priorities: Goals: 1. To Reduce the
- Page 7 and 8:
and a safe healthy environment in w
- Page 9 and 10:
activities. The Agency delivers abo
- Page 11 and 12:
Placer County is the second fastest
- Page 13 and 14:
(9000’). Topographic influences a
- Page 15 and 16:
Population Growth and Development I
- Page 17 and 18:
promotion of grant programs aimed a
- Page 19 and 20:
3. Assist local government in devel
- Page 21 and 22:
Colfax (Station 30) 1 - State Owned
- Page 23 and 24:
maintenance of the lookout is expec
- Page 25 and 26:
Remote Automated Weather Stations (
- Page 27 and 28:
Lincoln RAWS (Placer County) Locati
- Page 29 and 30:
along SRA-LRA boundaries. Normally
- Page 31 and 32:
Placer County Fire Safe Councils wi
- Page 33 and 34:
Dollar Point Yes 2001 Dutch Flat Ye
- Page 35 and 36:
Forest Yes 2001 Goodyears Bar Yes 2
- Page 37 and 38:
• Reduction of flammable vegetati
- Page 39 and 40:
Fairs and Public Events Fairs conti
- Page 41 and 42:
Together, these projects will creat
- Page 43 and 44:
urn will be conducted by CALFIRE, N
- Page 45 and 46:
2006 CFIP COST-SHARE CAP RATES PRAC
- Page 47 and 48:
will be target that enhance fire su
- Page 49 and 50:
SECTION V: PRE FIRE MANAGEMENT TACT
- Page 51 and 52:
Ignition management In order to bet
- Page 53 and 54:
Ignition Management Plan Battalion
- Page 55 and 56:
Sutter County Placer County nm Rail
- Page 57 and 58:
Equipment 14% 34 Railroad 0% Vehicl
- Page 59 and 60:
arrestor laws. The focus will be tr
- Page 61 and 62:
Ignition Management Plan Battalion
- Page 63 and 64:
da City Valley Valley s Valley Moun
- Page 65 and 66:
Vehicle 25% Railroad 0% Equipment 1
- Page 67 and 68:
inspectors conducting residential i
- Page 69 and 70:
Ignition Management Plan Battalion
- Page 71 and 72:
?¤ MERLE COLLINS RES Battalion 231
- Page 73 and 74:
Mitigation Strategies 1. Public Edu
- Page 75 and 76:
Table. 3 - Battalion 11 Fuel Modifi
- Page 77 and 78:
e done, but often delay burning unt
- Page 79 and 80:
S ES Oregon Peak COM/LO Dobbins FFS
- Page 81 and 82:
Mitigation Strategies 1. Public Edu
- Page 83 and 84:
Table 4 - Battalion 13 Fuel Modific
- Page 85 and 86:
The Division Supervisor that was re
- Page 87 and 88:
negligence were filed against Pacif
- Page 89 and 90:
nm ?Î Live Oak AÚ Yuba City Sutte
- Page 91 and 92:
Mitigation Strategies There are sev
- Page 93 and 94:
Vegetation Management: UC Field Sta
- Page 95 and 96:
Ignition Management Plan Battalion
- Page 97 and 98:
LY CREEK RES EEK RES ada City FFS #
- Page 99 and 100:
Mitigation Strategies 1. Public Edu
- Page 101 and 102:
B. Installation and Maintenance of
- Page 103 and 104:
The purpose of Cal Fire’s Califor
- Page 105 and 106:
Y 20 # Lookouts Incorperated Cities
- Page 107 and 108:
70 60 50 40 30 20 10 Railroad 0% Ve
- Page 109 and 110:
• Reduce the wildland fuel loadin
- Page 111 and 112:
Homes would have been critically th
- Page 113 and 114:
Ignition Management Plan Battalion
- Page 115 and 116:
?Î Battalion 2319 # Lookouts Incor
- Page 117 and 118:
Mitigation Strategies Fire Protecti
- Page 119 and 120:
Ignition Management Plan Battalion
- Page 121 and 122: FAR WEST RES ?¤ nm Battalion Incor
- Page 123 and 124: Equipment 31% 80 70 60 50 40 30 20
- Page 125 and 126: 2011 Action Plan: • Work with Uni
- Page 127 and 128: Battalion o AAB # k ECC Lookouts In
- Page 129 and 130: Equipment 18% Vehicle 20% Arson 14%
- Page 131 and 132: School organized functions i.e., Re
- Page 133 and 134: NEU Pre Fire Planning PRIORTY: 2 De
- Page 135 and 136: APPENDIX C: PRIORITY GOALS AND OBJE
- Page 137 and 138: a) Educate landowners, residents an
- Page 139 and 140: B. SACRAMENTO PROGRAMS AND STAFF OR
- Page 141 and 142: B. UNITS ONLY Goal 5: Develop a met
- Page 143 and 144: a) Establish a working group, consi
- Page 145 and 146: APPENDICES D-Z APPENDIX D Standards
- Page 147 and 148: shall be constructed of nonflammabl
- Page 149 and 150: Brush: Black Oak - higher leaf surf
- Page 151 and 152: 916.5, 936.5, 956.5 Procedures for
- Page 153 and 154: 132
- Page 155 and 156: Appendix G - Project Description MA
- Page 157 and 158: Appendix H - Project Description ES
- Page 159 and 160: 2. Educate the homeowners of the st
- Page 161 and 162: (2006) as the community has begun t
- Page 163 and 164: The final option for the landowners
- Page 165 and 166: to provide chipping services throug
- Page 167 and 168: The most recent grant for Defensibl
- Page 169 and 170: Appendix N - Project Description DE
- Page 171: program at the time of the inspecti
- Page 175 and 176: Appendix Q - Project Description SE
- Page 177 and 178: Appendix S - Project Description YU
- Page 179 and 180: Association 1015 Trails End/Wilson
- Page 181 and 182: Dover Scotts Flat Pine Group #1 Ton
- Page 183 and 184: Appendix U - Cooperator Projects: P
- Page 185 and 186: Union Pacific Railroad right-of-way
- Page 187 and 188: 2010 Skylandia 2010 Highlands TCPUD
- Page 189 and 190: Gills Hill Fuel Break Northstar CDC
- Page 191 and 192: 2009 Northstar 5B Block 7 Unknown P
- Page 193 and 194: 2010-2011 Firewise 2010-2011 Columb
- Page 195 and 196: 2006-2007 Special Needs Assistance
- Page 197 and 198: Yuba County Public Works Project Na
- Page 200 and 201: I. General II. Objectives III. Plan
- Page 202 and 203: ♦ Option “B” • The Unit wil
- Page 204 and 205: VIII. Ordering & Logistics • Reso
- Page 206 and 207: RESOURCE MGT NEVADA DIVISION NEVADA
- Page 208 and 209: nm ?é Battalion Incorperated Citie