- Page 1 and 2:
Unit Strategic Fire Plan Nevada-Yub
- Page 3 and 4:
SIGNATURES Unit Strategic Fire Plan
- Page 5 and 6:
Priorities: Goals: 1. To Reduce the
- Page 7 and 8:
and a safe healthy environment in w
- Page 9 and 10:
activities. The Agency delivers abo
- Page 11 and 12:
Placer County is the second fastest
- Page 13 and 14:
(9000’). Topographic influences a
- Page 15 and 16:
Population Growth and Development I
- Page 17 and 18:
promotion of grant programs aimed a
- Page 19 and 20:
3. Assist local government in devel
- Page 21 and 22:
Colfax (Station 30) 1 - State Owned
- Page 23 and 24:
maintenance of the lookout is expec
- Page 25 and 26:
Remote Automated Weather Stations (
- Page 27 and 28: Lincoln RAWS (Placer County) Locati
- Page 29 and 30: along SRA-LRA boundaries. Normally
- Page 31 and 32: Placer County Fire Safe Councils wi
- Page 33 and 34: Dollar Point Yes 2001 Dutch Flat Ye
- Page 35 and 36: Forest Yes 2001 Goodyears Bar Yes 2
- Page 37 and 38: • Reduction of flammable vegetati
- Page 39 and 40: Fairs and Public Events Fairs conti
- Page 41 and 42: Together, these projects will creat
- Page 43 and 44: urn will be conducted by CALFIRE, N
- Page 45 and 46: 2006 CFIP COST-SHARE CAP RATES PRAC
- Page 47 and 48: will be target that enhance fire su
- Page 49 and 50: SECTION V: PRE FIRE MANAGEMENT TACT
- Page 51 and 52: Ignition management In order to bet
- Page 53 and 54: Ignition Management Plan Battalion
- Page 55 and 56: Sutter County Placer County nm Rail
- Page 57 and 58: Equipment 14% 34 Railroad 0% Vehicl
- Page 59 and 60: arrestor laws. The focus will be tr
- Page 61 and 62: Ignition Management Plan Battalion
- Page 63 and 64: da City Valley Valley s Valley Moun
- Page 65 and 66: Vehicle 25% Railroad 0% Equipment 1
- Page 67 and 68: inspectors conducting residential i
- Page 69 and 70: Ignition Management Plan Battalion
- Page 71 and 72: ?¤ MERLE COLLINS RES Battalion 231
- Page 73 and 74: Mitigation Strategies 1. Public Edu
- Page 75 and 76: Table. 3 - Battalion 11 Fuel Modifi
- Page 77: e done, but often delay burning unt
- Page 81 and 82: Mitigation Strategies 1. Public Edu
- Page 83 and 84: Table 4 - Battalion 13 Fuel Modific
- Page 85 and 86: The Division Supervisor that was re
- Page 87 and 88: negligence were filed against Pacif
- Page 89 and 90: nm ?Î Live Oak AÚ Yuba City Sutte
- Page 91 and 92: Mitigation Strategies There are sev
- Page 93 and 94: Vegetation Management: UC Field Sta
- Page 95 and 96: Ignition Management Plan Battalion
- Page 97 and 98: LY CREEK RES EEK RES ada City FFS #
- Page 99 and 100: Mitigation Strategies 1. Public Edu
- Page 101 and 102: B. Installation and Maintenance of
- Page 103 and 104: The purpose of Cal Fire’s Califor
- Page 105 and 106: Y 20 # Lookouts Incorperated Cities
- Page 107 and 108: 70 60 50 40 30 20 10 Railroad 0% Ve
- Page 109 and 110: • Reduce the wildland fuel loadin
- Page 111 and 112: Homes would have been critically th
- Page 113 and 114: Ignition Management Plan Battalion
- Page 115 and 116: ?Î Battalion 2319 # Lookouts Incor
- Page 117 and 118: Mitigation Strategies Fire Protecti
- Page 119 and 120: Ignition Management Plan Battalion
- Page 121 and 122: FAR WEST RES ?¤ nm Battalion Incor
- Page 123 and 124: Equipment 31% 80 70 60 50 40 30 20
- Page 125 and 126: 2011 Action Plan: • Work with Uni
- Page 127 and 128: Battalion o AAB # k ECC Lookouts In
- Page 129 and 130:
Equipment 18% Vehicle 20% Arson 14%
- Page 131 and 132:
School organized functions i.e., Re
- Page 133 and 134:
NEU Pre Fire Planning PRIORTY: 2 De
- Page 135 and 136:
APPENDIX C: PRIORITY GOALS AND OBJE
- Page 137 and 138:
a) Educate landowners, residents an
- Page 139 and 140:
B. SACRAMENTO PROGRAMS AND STAFF OR
- Page 141 and 142:
B. UNITS ONLY Goal 5: Develop a met
- Page 143 and 144:
a) Establish a working group, consi
- Page 145 and 146:
APPENDICES D-Z APPENDIX D Standards
- Page 147 and 148:
shall be constructed of nonflammabl
- Page 149 and 150:
Brush: Black Oak - higher leaf surf
- Page 151 and 152:
916.5, 936.5, 956.5 Procedures for
- Page 153 and 154:
132
- Page 155 and 156:
Appendix G - Project Description MA
- Page 157 and 158:
Appendix H - Project Description ES
- Page 159 and 160:
2. Educate the homeowners of the st
- Page 161 and 162:
(2006) as the community has begun t
- Page 163 and 164:
The final option for the landowners
- Page 165 and 166:
to provide chipping services throug
- Page 167 and 168:
The most recent grant for Defensibl
- Page 169 and 170:
Appendix N - Project Description DE
- Page 171 and 172:
program at the time of the inspecti
- Page 173 and 174:
Nevada County. These funds will be
- Page 175 and 176:
Appendix Q - Project Description SE
- Page 177 and 178:
Appendix S - Project Description YU
- Page 179 and 180:
Association 1015 Trails End/Wilson
- Page 181 and 182:
Dover Scotts Flat Pine Group #1 Ton
- Page 183 and 184:
Appendix U - Cooperator Projects: P
- Page 185 and 186:
Union Pacific Railroad right-of-way
- Page 187 and 188:
2010 Skylandia 2010 Highlands TCPUD
- Page 189 and 190:
Gills Hill Fuel Break Northstar CDC
- Page 191 and 192:
2009 Northstar 5B Block 7 Unknown P
- Page 193 and 194:
2010-2011 Firewise 2010-2011 Columb
- Page 195 and 196:
2006-2007 Special Needs Assistance
- Page 197 and 198:
Yuba County Public Works Project Na
- Page 200 and 201:
I. General II. Objectives III. Plan
- Page 202 and 203:
♦ Option “B” • The Unit wil
- Page 204 and 205:
VIII. Ordering & Logistics • Reso
- Page 206 and 207:
RESOURCE MGT NEVADA DIVISION NEVADA
- Page 208 and 209:
nm ?é Battalion Incorperated Citie