<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LTD<br />

C.A.No.03/<strong>CIDCO</strong>/EE(Elect)/2011-12 Sr. Page No.<br />

4.3 All earth electrodes shall be tested for earth resistance by means of<br />

standard earth test meter. The tests shall take place in dry months,<br />

preferably after a protracted dry spell. If necessary, a number of<br />

electrodes shall be connected in parallel to reduce the earth resistance.<br />

In such a case the distance between two electrodes shall not be less than<br />

twice the length of electrode.<br />

4.4 The electrodes shall have a clean surface, not covered by paint, enamel,<br />

grease or other materials of poor conductivity.<br />

4.5 The exact location and number of earth electrodes required at each<br />

location shall be determined in the field in consultation with the<br />

owner/Engineer-in-charge, depending on the soil strata and resistivity, to<br />

meet the ohmic values prescribed in clause 4.3.<br />

4.6 The disconnect facility shall be provided for the individual earth pits to<br />

check their earth resistance periodically.<br />

5.0 CONNECTION :<br />

5.1 All electrical equipment is to be doubly earthed by connecting two points<br />

on equipment to main earthing ring. The earthing ring will be connected<br />

via links to several earth electrodes. The cable armour will be earthed<br />

through the cable glands.<br />

5.2 The following shall be earthed.<br />

1. Transformer neutrals (Double Earthing).<br />

2. Transformer Housing.<br />

3. All switchgear and their earth buses.