<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LTD<br />

C.A.No.03/<strong>CIDCO</strong>/EE(Elect)/2011-12 Sr. Page No.<br />

filed to avoid interference with structures, piping or air-conditioning duct<br />

and minor adjustments shall be done to suit the filed conditions wherever<br />

deemed necessary without any extra cost.<br />

4.2 High voltage, medium voltage and other control and communication<br />

cables shall be separated from each other by adequate spacing or running<br />

through independent pipes, trenches or cable trays, as applicable.<br />

4.3 All cable routes shall be carefully measured and cables cut to the required<br />

lengths, leaving sufficient lengths for the final connection of the cable to<br />

the terminal of the equipment. The various cable lengths cut form the<br />

cable reels shall be carefully selected to prevent undue wastage of cables.<br />

The quantity indicated in the cable schedule is only approximate. The<br />

contractor shall ascertain the exact requirement of cable for a particular<br />

feeder by measuring at site and avoiding interference with structure,<br />

foundation, pipelines or any other works.<br />

4.4 Cables as far as possible shall be laid in complete, uncut lengths from one<br />

termination to the other.<br />

4.5 Cables shall be neatly arranged in the trenches/trays in such manner so<br />

that criss-crossing is avoided and final take off to the motor/switchgear is<br />

facilitated. Arrangement of cables within the trench/trays shall be the<br />

responsibility of the contractor.<br />

4.6 All cables will be identified close to their termination point by cable<br />

numbers as per cable schedule. Cable numbers will be punched on<br />

aluminium straps (2 mm thick) securely fastened to the cable and srapped<br />

around it. Alternatively cable tags shall be circular in construction to<br />

which cable numbers can be conveniently punched. Each underground<br />

cable shall be provided with identify tags of lead securely fastened every