<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LTD<br />
C.A.No.03/<strong>CIDCO</strong>/EE(Elect)/2011-12 Sr. Page No.<br />
6.2 Measure the insulation resistance of directly buried cable circuits before<br />
cable trenches are back-filled. Repeat measurement after back filling.<br />
6.3 D.C. High voltage test shall be made after installation on the<br />
following:-<br />
1) All 1000 Volts grade cables in which straight through joints have<br />
been made.<br />
2) All cables above 1100 V grade. For record purposes test data shall<br />
include the measure values of leakage current verses time.<br />
The D.C. High voltage test shall be performed as detailed below in<br />
the presence of the Engineer-in-charge or his authorized<br />
representative only.<br />
Cables shall be installed in final position with all the straight<br />
through joints complete. Terminations shall be kept unfinished so<br />
that motors, switchgears, transformers etc. are not subjected to<br />
test voltage.<br />
The test voltage and duration shall be as per relevant codes and<br />
practices of Indian Standard Institution.<br />
7.0 H.T. CABLE LAYING<br />
7.1 CABLES LAID IN BUILT UP TRENCHES :<br />
7.1.1 Cables laid in the built-up trenches within the building shall be raised so<br />
as not to lay at the trench bottom. Cables shall be either secured to the<br />
wall by saddles or laid on angle iron brackets or cable trays, ladders,<br />
rack, trough etc. as approved by <strong>CIDCO</strong>. Where cables are laid on cable