06.08.2013 Views

SCOPE OF WORK (ELECTRICAL) - CIDCO Maharashtra Ltd.

SCOPE OF WORK (ELECTRICAL) - CIDCO Maharashtra Ltd.

SCOPE OF WORK (ELECTRICAL) - CIDCO Maharashtra Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LTD<br />

C.A.No.03/<strong>CIDCO</strong>/EE(Elect)/2011-12 Sr. Page No.<br />

65. IS:2516 - A.C. Circuit breakers.<br />

66. IS:2667 - Fittings for rigid steel conduits for<br />

electrical wiring.<br />

67. IS:2692 - 11 KV drop out fuses.<br />

68. IS:2575 - Enclosed distribution fuse boards and<br />

cutouts for voltage upto 1000 V.<br />

69. IS:2705 - Current transformer.<br />

70. IS 14930 II - Double Walled Corrugated pipes of High<br />

Density Polyethylene (HDPE) with<br />

couplings, tees, sockets for cable<br />

protection.<br />

The entire electrical installation work shall be strictly complied with the codes,<br />

standards, rules and regulations framed under the Indian Electricity Act. Further<br />

it shall be strictly carried out as per the regulations and rules set out by “Tariff<br />

Advisory Committee and/or Fire Insurance Regulations”.<br />

Some of the rules framed under the Indian Electricity Rules, 1956 and all<br />

amendments thereof more particularly complied to :<br />

35, 43, 44, 44-A, 45 (Part), 50, 51, 59, 61 (a), 61 (c), 62, 63 (2), 65, 66, 67, 68,<br />

69 and 92(2).<br />

_______________________ _______________________<br />

Stamp and signature of<br />

Contractor<br />

Addl. Chief Engineer (II)<br />

Date :<br />

Date :

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!