<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LTD<br />

C.A.No.03/<strong>CIDCO</strong>/EE(Elect)/2011-12 Sr. Page No.<br />

brackets, the brackets shall not be fixed more than 500 mm. apart to<br />

avoid sag in the cables. Where cables shall be fixed with cable tie or<br />

saddles and shall be at minimum 25 mm. away from side walls and<br />

minimum 150 mm distance shall be observed between two adjacent<br />

cables.<br />

7.1.2 The dimensions of the trenches shall be determined depending upon the<br />

maximum number of cables that is expected to be accommodated.<br />

Wherever specified, trenches shall be filled with fine sand and covered<br />

with RCC or steel chequered trench covers.<br />

7.2 DUCT SYSTEM :<br />

Wherever specified cables shall be laid in underground ducts. The duct<br />

system shall consist of required number of reinforced hume pipes with<br />

simplex joints. The ducts shall be properly anchored to prevent any<br />

movement. The top surface of the cable ducts shall not be less than<br />

100 mm below the ground level. The ducts shall be provided with<br />

inspection manholes at all direction changes and at required regular<br />

intervals of 50 mtr. for drawing the cables. The manholes shall be at<br />

reinforced concrete either cast-in-situ or precast. The manhole covers<br />

shall be RCC cover of suitable weight to withstand the load of the road<br />

vehicle. The ducts shall be properly plugged at the ends to prevent<br />

entry of water, rodents etc. Suitable duct markers shall be placed along<br />

the run of the cable ducts. The duct markers shall be at least be 15<br />

cms. square embedded in concrete, indicating the voltage, number of<br />

ducts and direction of run of the cable be provided in the manholes for<br />

supporting the cables. Proper identification tags shall be provided for<br />

each cable in the manholes.