<strong>CIDCO</strong> <strong>OF</strong> MAHARASHTRA LTD<br />
C.A.No.03/<strong>CIDCO</strong>/EE(Elect)/2011-12 Sr. Page No.<br />
brackets, the brackets shall not be fixed more than 500 mm. apart to<br />
avoid sag in the cables. Where cables shall be fixed with cable tie or<br />
saddles and shall be at minimum 25 mm. away from side walls and<br />
minimum 150 mm distance shall be observed between two adjacent<br />
cables.<br />
7.1.2 The dimensions of the trenches shall be determined depending upon the<br />
maximum number of cables that is expected to be accommodated.<br />
Wherever specified, trenches shall be filled with fine sand and covered<br />
with RCC or steel chequered trench covers.<br />
7.2 DUCT SYSTEM :<br />
Wherever specified cables shall be laid in underground ducts. The duct<br />
system shall consist of required number of reinforced hume pipes with<br />
simplex joints. The ducts shall be properly anchored to prevent any<br />
movement. The top surface of the cable ducts shall not be less than<br />
100 mm below the ground level. The ducts shall be provided with<br />
inspection manholes at all direction changes and at required regular<br />
intervals of 50 mtr. for drawing the cables. The manholes shall be at<br />
reinforced concrete either cast-in-situ or precast. The manhole covers<br />
shall be RCC cover of suitable weight to withstand the load of the road<br />
vehicle. The ducts shall be properly plugged at the ends to prevent<br />
entry of water, rodents etc. Suitable duct markers shall be placed along<br />
the run of the cable ducts. The duct markers shall be at least be 15<br />
cms. square embedded in concrete, indicating the voltage, number of<br />
ducts and direction of run of the cable be provided in the manholes for<br />
supporting the cables. Proper identification tags shall be provided for<br />
each cable in the manholes.