14.08.2013 Views

May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...

May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...

May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ect people you can imag<strong>in</strong>e. For<br />

that reason it is def<strong>in</strong>itely the bid<br />

that counts. After bid submission<br />

there is very little room for correction<br />

of performance, scope and<br />

prices. Client and consult<strong>in</strong>g eng<strong>in</strong>eer<br />

usually select one or two companies<br />

with<strong>in</strong> a very short time. The<br />

supplier will either f<strong>in</strong>d himself on<br />

the negotiation table very soon or<br />

won’t hear anyth<strong>in</strong>g at all...<br />

The co-operation <strong>in</strong> the field of<br />

Compact Hydro is now <strong>in</strong>creas<strong>in</strong>gly<br />

bear<strong>in</strong>g fruit.<br />

Dur<strong>in</strong>g 2002, VA TECH <strong>HYDRO</strong> Jevnaker<br />

could secure three orders <strong>in</strong><br />

Norway with Compact Francis Turb<strong>in</strong>es:<br />

Kolfossen, Stølsvann and<br />

Vikeså. For two further projects, a<br />

Letter of Intent was awarded:<br />

Kongsfoss and Bersåvatn.<br />

L<strong>in</strong>dland hydropower plant, awarded<br />

as a complete M+E project <strong>in</strong><br />

Visualisation with comfortable touch screen<br />

operation: our latest turb<strong>in</strong>e control generation<br />

2001, was commissioned this year.<br />

The two compact Francis turb<strong>in</strong>es<br />

with a total output of 10 MW are operat<strong>in</strong>g<br />

to the full satisfaction of the<br />

owner Dalane Energi. After L<strong>in</strong>dland,<br />

Dalane Energi has ordered two<br />

more Compact units (Stølsvann and<br />

Vikeså).<br />

For all the above plants the new SAT<br />

turb<strong>in</strong>e governor TC 1703 has been<br />

sold or already commissioned. With<br />

L<strong>in</strong>dland power plant: after commission<strong>in</strong>g <strong>in</strong> the cavern<br />

its visualisation software and touch<br />

screen operation we can provide<br />

maximum comfort at maximum<br />

plant safety. Also, communication<br />

to various types of remote control<br />

systems have to be performed with<br />

this new system.<br />

VA TECH <strong>HYDRO</strong> Jevnaker also operates<br />

a branch <strong>in</strong> Sweden. Despite<br />

relatively low project activity we<br />

could sell one compact Kaplan turb<strong>in</strong>e<br />

that will go <strong>in</strong> operation early <strong>in</strong><br />

autumn <strong>2003</strong>.<br />

Ralph Poschenrieder<br />

Phone +49/751 83 2832<br />

ralph.poschenrieder@vatew.de<br />

Technical data L<strong>in</strong>dland:<br />

Unit: 1 2<br />

Output: 3.4 / 5.6 MW<br />

Net head: 98 / 98 m<br />

Speed: 1,000 / 750 rpm<br />

Runner diameter: 720 / 921 mm<br />

Technical data Kolfossen:<br />

Output: 2.8 MW<br />

Voltage: 6.6 kV<br />

Net head: 44 m<br />

Speed: 500 rpm<br />

Runner diameter: 1,000 mm<br />

Technical data Stölsvann:<br />

Output: 1.52 MW<br />

Voltage: 0.69 kV<br />

Net head: 106 m<br />

Speed: 1,000 rpm<br />

Runner diameter: 475 mm<br />

Technical data Vikesa:<br />

Output: 4.5 MW<br />

Voltage: 6.6 kV<br />

Net head: 100 m<br />

Speed: 600 rpm<br />

Runner diameter: 850 mm<br />

Technical data Kongsfoss:<br />

Output: 2.9 MW<br />

Voltage: 6.6 kV<br />

Net head: 14.7 m<br />

Speed: 333 rpm<br />

Runner diameter: 1,770 mm<br />

Technical data Johannisholm:<br />

Output: 1.56 MW<br />

Voltage: 0.69 kV<br />

Net head: 6.3 m<br />

Speed: 176.5 rpm<br />

Runner diameter: 2,150 mm<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!