14.08.2013 Views

May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...

May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...

May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

USA<br />

JAYBIRD<br />

SACRAMENTO MUNICIPAL UTILI-<br />

TY DISTRICT (SMUD) signed a contract<br />

with VA TECH <strong>HYDRO</strong> USA <strong>in</strong><br />

October 2002 for the design and<br />

supply of two Pelton – replacement<br />

runners, manufactured <strong>in</strong> reliable<br />

HIWELD technology <strong>in</strong> L<strong>in</strong>z.<br />

The HIWELD technology uses runner<br />

disks and runner buckets made of<br />

high-quality forged sta<strong>in</strong>less steel,<br />

welded together <strong>in</strong> areas of low and<br />

safe stress levels. Thus areas of the<br />

buckets subjected to high stress are<br />

made of top quality forged materials.<br />

F<strong>in</strong>ally these characteristics were the<br />

decision basis of SMUD for plac<strong>in</strong>g the<br />

order with VA TECH <strong>HYDRO</strong> aga<strong>in</strong>st<br />

conventional cast runners. The Jaybird<br />

power station, located east of Sacramento<br />

<strong>in</strong> California, which <strong>in</strong>cludes<br />

two vertical Pelton turb<strong>in</strong>es with six<br />

nozzles, will receive delivery of the first<br />

runner with<strong>in</strong> one year and the second<br />

will follow two weeks later.<br />

Mike Byrne<br />

Phone +41/704 943 4343<br />

mbyrne@vatechhydro.com<br />

SPAIN<br />

HIGHLIGHTS<br />

Technical data:<br />

Output: 79.5 MW<br />

Head: 456.6 m<br />

Speed: 300 rpm<br />

Runner diameter: 2,718 mm<br />

O NOVO PINDO<br />

Ferroatlantica has awarded<br />

VA TECH <strong>HYDRO</strong> <strong>in</strong> Spa<strong>in</strong> a contract<br />

for the supply of an 11 MW<br />

Francis turb<strong>in</strong>e for its O Novo<br />

P<strong>in</strong>do facility.<br />

The contract follows a prelim<strong>in</strong>ary<br />

project jo<strong>in</strong>tly carried out by<br />

VA TECH <strong>HYDRO</strong> <strong>in</strong> Spa<strong>in</strong> and Elecnor,<br />

based on the Ferroatlantica<br />

idea of <strong>in</strong>stall<strong>in</strong>g an 11 MW Francis<br />

turb<strong>in</strong>e, us<strong>in</strong>g the build<strong>in</strong>g of the old<br />

P<strong>in</strong>do power plant, discont<strong>in</strong>ued<br />

many years ago. VA TECH <strong>HYDRO</strong>´s<br />

partner <strong>in</strong> this project, Elecnor, is<br />

an electrical supplier, with whom<br />

VA TECH <strong>HYDRO</strong> has had a close<br />

16<br />

relationship for a long time ago<br />

as partner and as supplier <strong>in</strong><br />

Spanish projects. The scope of<br />

supply <strong>in</strong>cludes an 11 MW Francis<br />

turb<strong>in</strong>e, a synchronous generator,<br />

an ND 1250 butterfly valve, a<br />

digital speed governor, a 70 m<br />

penstock, erection, and commission<strong>in</strong>g.<br />

Technical data:<br />

Output: 11 MW<br />

Head: 202 m<br />

Speed: 600 rpm<br />

Runner diameter: 1,443 mm<br />

Alfonso Madera<br />

Phone +34/91 425 10 38<br />

alfonso.madera@vatech-hydro.net<br />

MEXICO<br />

AGUA PRIETA<br />

VA TECH <strong>HYDRO</strong> <strong>in</strong> Switzerland has<br />

received an order for the supply of<br />

two additional MicroGuss replacement<br />

runners for Comisión Federal<br />

de Electricidad (CFE) <strong>in</strong> Mexico.<br />

CFE has an <strong>in</strong>stalled capacity of<br />

9,400 MW <strong>in</strong> hydropower and supplies<br />

more than 90 % of the Mexicans<br />

with energy. MicroGuss is a fabrication<br />

method for Pelton runners employ<strong>in</strong>g<br />

forged materials <strong>in</strong> highstress<br />

zones. Resistance to corrosion<br />

fatigue is significantly higher than of<br />

conventional cast<strong>in</strong>gs and prevents<br />

crack<strong>in</strong>g <strong>in</strong> bucket roots.<br />

MicroGuss runners feature <strong>in</strong>creased<br />

lifetime, plant output, safety,<br />

and availability as well as reduced<br />

ma<strong>in</strong>tenance expenses. The new Pelton<br />

runners, with a weight of more<br />

than 20 t each, will be delivered <strong>in</strong> Mai<br />

2004 and June 2004, respectively.<br />

Technical data:<br />

Output: 120 MW<br />

Head: 508 m<br />

Speed: 300 rpm<br />

Runner diameter: 3,770 mm<br />

Christoph Bütikofer<br />

Phone +41/41 329 53 72<br />

christoph.buetikofer@vatech–hydro.ch<br />

NORWAY<br />

ØVRE OTTA<br />

In December 2002 Norge Opplandskraft<br />

DA awarded a contract<br />

to VA TECH <strong>HYDRO</strong> for<br />

the design, manufacture, supply,<br />

<strong>in</strong>stallation, and commission<strong>in</strong>g<br />

of four synchronous generators.<br />

Øvre Otta is a group of power<br />

plants located <strong>in</strong> the western part<br />

of Norway consist<strong>in</strong>g of two <strong>in</strong>dependent<br />

powerhouses operat<strong>in</strong>g<br />

underground: Framruste and<br />

Øyberget.<br />

Framruste utilizes a net head of<br />

approximately 325 m between<br />

Raudalsvatnet and Pollvatnet and<br />

Øyberget has a net head of approximately<br />

150 m between<br />

Heggebottvatnet and Dønfossen.<br />

The first unit is scheduled to be<br />

back on l<strong>in</strong>e <strong>in</strong> June 2005.<br />

Technical data Framruste:<br />

Output: 85 MVA<br />

Voltage: 11 kV<br />

Head: 325 m<br />

Speed: 500 rpm<br />

Stator diameter: 5,200 mm<br />

Technical data Oyberget:<br />

Output: 10/29/67 MVA<br />

Voltage: 11/10.5/10.5 kV<br />

Head: 150 m<br />

Speed: 750/500/333.3 rpm<br />

Stator diameter:2,700/4,700/5,700 mm<br />

Franz Cirnfus<br />

Phone +43/1 89100 2666<br />

franz.cirnfus@vatech-hydro.at<br />

NORWAY<br />

LYSEBOTN<br />

VA TECH <strong>HYDRO</strong> has secured a<br />

contract with Norway-based Lyse<br />

Produksjon AS for the delivery of<br />

12 new MicroGuss (MG) Pelton<br />

runners for the Lysebotn plant,<br />

near Stavanger.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!