May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...
May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...
May 2003 ISSUE TONGBAI Page 4/5 COMPACT HYDRO in ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
USA<br />
JAYBIRD<br />
SACRAMENTO MUNICIPAL UTILI-<br />
TY DISTRICT (SMUD) signed a contract<br />
with VA TECH <strong>HYDRO</strong> USA <strong>in</strong><br />
October 2002 for the design and<br />
supply of two Pelton – replacement<br />
runners, manufactured <strong>in</strong> reliable<br />
HIWELD technology <strong>in</strong> L<strong>in</strong>z.<br />
The HIWELD technology uses runner<br />
disks and runner buckets made of<br />
high-quality forged sta<strong>in</strong>less steel,<br />
welded together <strong>in</strong> areas of low and<br />
safe stress levels. Thus areas of the<br />
buckets subjected to high stress are<br />
made of top quality forged materials.<br />
F<strong>in</strong>ally these characteristics were the<br />
decision basis of SMUD for plac<strong>in</strong>g the<br />
order with VA TECH <strong>HYDRO</strong> aga<strong>in</strong>st<br />
conventional cast runners. The Jaybird<br />
power station, located east of Sacramento<br />
<strong>in</strong> California, which <strong>in</strong>cludes<br />
two vertical Pelton turb<strong>in</strong>es with six<br />
nozzles, will receive delivery of the first<br />
runner with<strong>in</strong> one year and the second<br />
will follow two weeks later.<br />
Mike Byrne<br />
Phone +41/704 943 4343<br />
mbyrne@vatechhydro.com<br />
SPAIN<br />
HIGHLIGHTS<br />
Technical data:<br />
Output: 79.5 MW<br />
Head: 456.6 m<br />
Speed: 300 rpm<br />
Runner diameter: 2,718 mm<br />
O NOVO PINDO<br />
Ferroatlantica has awarded<br />
VA TECH <strong>HYDRO</strong> <strong>in</strong> Spa<strong>in</strong> a contract<br />
for the supply of an 11 MW<br />
Francis turb<strong>in</strong>e for its O Novo<br />
P<strong>in</strong>do facility.<br />
The contract follows a prelim<strong>in</strong>ary<br />
project jo<strong>in</strong>tly carried out by<br />
VA TECH <strong>HYDRO</strong> <strong>in</strong> Spa<strong>in</strong> and Elecnor,<br />
based on the Ferroatlantica<br />
idea of <strong>in</strong>stall<strong>in</strong>g an 11 MW Francis<br />
turb<strong>in</strong>e, us<strong>in</strong>g the build<strong>in</strong>g of the old<br />
P<strong>in</strong>do power plant, discont<strong>in</strong>ued<br />
many years ago. VA TECH <strong>HYDRO</strong>´s<br />
partner <strong>in</strong> this project, Elecnor, is<br />
an electrical supplier, with whom<br />
VA TECH <strong>HYDRO</strong> has had a close<br />
16<br />
relationship for a long time ago<br />
as partner and as supplier <strong>in</strong><br />
Spanish projects. The scope of<br />
supply <strong>in</strong>cludes an 11 MW Francis<br />
turb<strong>in</strong>e, a synchronous generator,<br />
an ND 1250 butterfly valve, a<br />
digital speed governor, a 70 m<br />
penstock, erection, and commission<strong>in</strong>g.<br />
Technical data:<br />
Output: 11 MW<br />
Head: 202 m<br />
Speed: 600 rpm<br />
Runner diameter: 1,443 mm<br />
Alfonso Madera<br />
Phone +34/91 425 10 38<br />
alfonso.madera@vatech-hydro.net<br />
MEXICO<br />
AGUA PRIETA<br />
VA TECH <strong>HYDRO</strong> <strong>in</strong> Switzerland has<br />
received an order for the supply of<br />
two additional MicroGuss replacement<br />
runners for Comisión Federal<br />
de Electricidad (CFE) <strong>in</strong> Mexico.<br />
CFE has an <strong>in</strong>stalled capacity of<br />
9,400 MW <strong>in</strong> hydropower and supplies<br />
more than 90 % of the Mexicans<br />
with energy. MicroGuss is a fabrication<br />
method for Pelton runners employ<strong>in</strong>g<br />
forged materials <strong>in</strong> highstress<br />
zones. Resistance to corrosion<br />
fatigue is significantly higher than of<br />
conventional cast<strong>in</strong>gs and prevents<br />
crack<strong>in</strong>g <strong>in</strong> bucket roots.<br />
MicroGuss runners feature <strong>in</strong>creased<br />
lifetime, plant output, safety,<br />
and availability as well as reduced<br />
ma<strong>in</strong>tenance expenses. The new Pelton<br />
runners, with a weight of more<br />
than 20 t each, will be delivered <strong>in</strong> Mai<br />
2004 and June 2004, respectively.<br />
Technical data:<br />
Output: 120 MW<br />
Head: 508 m<br />
Speed: 300 rpm<br />
Runner diameter: 3,770 mm<br />
Christoph Bütikofer<br />
Phone +41/41 329 53 72<br />
christoph.buetikofer@vatech–hydro.ch<br />
NORWAY<br />
ØVRE OTTA<br />
In December 2002 Norge Opplandskraft<br />
DA awarded a contract<br />
to VA TECH <strong>HYDRO</strong> for<br />
the design, manufacture, supply,<br />
<strong>in</strong>stallation, and commission<strong>in</strong>g<br />
of four synchronous generators.<br />
Øvre Otta is a group of power<br />
plants located <strong>in</strong> the western part<br />
of Norway consist<strong>in</strong>g of two <strong>in</strong>dependent<br />
powerhouses operat<strong>in</strong>g<br />
underground: Framruste and<br />
Øyberget.<br />
Framruste utilizes a net head of<br />
approximately 325 m between<br />
Raudalsvatnet and Pollvatnet and<br />
Øyberget has a net head of approximately<br />
150 m between<br />
Heggebottvatnet and Dønfossen.<br />
The first unit is scheduled to be<br />
back on l<strong>in</strong>e <strong>in</strong> June 2005.<br />
Technical data Framruste:<br />
Output: 85 MVA<br />
Voltage: 11 kV<br />
Head: 325 m<br />
Speed: 500 rpm<br />
Stator diameter: 5,200 mm<br />
Technical data Oyberget:<br />
Output: 10/29/67 MVA<br />
Voltage: 11/10.5/10.5 kV<br />
Head: 150 m<br />
Speed: 750/500/333.3 rpm<br />
Stator diameter:2,700/4,700/5,700 mm<br />
Franz Cirnfus<br />
Phone +43/1 89100 2666<br />
franz.cirnfus@vatech-hydro.at<br />
NORWAY<br />
LYSEBOTN<br />
VA TECH <strong>HYDRO</strong> has secured a<br />
contract with Norway-based Lyse<br />
Produksjon AS for the delivery of<br />
12 new MicroGuss (MG) Pelton<br />
runners for the Lysebotn plant,<br />
near Stavanger.