DA PU<br />

VA TECH <strong>HYDRO</strong> was awarded a<br />

new contract for the electromechanical<br />

equipment for the<br />

run-of-river power plant at Da Pu,<br />

Guangxi prov<strong>in</strong>ce. This cont<strong>in</strong>ues<br />

a l<strong>in</strong>e of success for bulb turb<strong>in</strong>es<br />

and generators <strong>in</strong>clud<strong>in</strong>g plant<br />

equipment <strong>in</strong> Ch<strong>in</strong>a.<br />

The run-of-river power plant Da Pu<br />

has an <strong>in</strong>stalled capacity of 93 MW<br />

and is located on the river Liu close<br />

to the city of Liu Zhou <strong>in</strong> the<br />

Guangxi Zhuang Autonomous Region<br />

<strong>in</strong> the south of Ch<strong>in</strong>a. Our customer<br />

is the Instrimpex Equipment<br />

Import and Export Corporation and<br />

the enduser is Guangxi Liuzhou<br />

Guiliu Hydropower. The contract<br />

was signed <strong>in</strong> Beij<strong>in</strong>g on <strong>May</strong> 16,<br />

2001, and came <strong>in</strong>to force on September<br />

13, 2002. VA TECH <strong>HYDRO</strong><br />

had already followed this project<br />

s<strong>in</strong>ce 1993 and f<strong>in</strong>al negotiation of<br />

the contract was concluded <strong>in</strong> 2001.<br />

Dur<strong>in</strong>g this rather long period the<br />

prelim<strong>in</strong>ary design was done and today<br />

civil construction is already at a<br />

very advanced stage.<br />

VA TECH <strong>HYDRO</strong>’s scope of supply<br />

consists of:<br />

• three horizontal shaft Kaplan bulb<br />

turb<strong>in</strong>es <strong>in</strong>clud<strong>in</strong>g electronic<br />

speed governors of the digital type<br />

• three bulb generators<br />

• generator switchgear<br />

• excitation<br />

• protection<br />

• control and automation systems<br />

The design of the turb<strong>in</strong>es and generators<br />

– both components of Austrian<br />

orig<strong>in</strong> for f<strong>in</strong>anc<strong>in</strong>g reasons –<br />

as well as of the electrical balance<br />

of plant equipment is <strong>in</strong> full sw<strong>in</strong>g <strong>in</strong><br />

L<strong>in</strong>z, Vienna, and Beij<strong>in</strong>g. Liaison<br />

meet<strong>in</strong>gs with the responsible people<br />

of the Ch<strong>in</strong>ese partners com<strong>in</strong>g<br />

from the Guangxi Water & Power<br />

Design Institute as well as from the<br />

client are tak<strong>in</strong>g place just now.<br />

Companies <strong>in</strong> Ch<strong>in</strong>a will manufacture<br />

the embedded steel components.<br />

The turb<strong>in</strong>e governors as well<br />

KEY PROJECTS<br />

as control and automation systems<br />

are to be provided with the new<br />

NEPTUN technology developed by<br />

VA TECH <strong>HYDRO</strong>.<br />

Supply of the ma<strong>in</strong> equipment will<br />

start already <strong>in</strong> <strong>2003</strong> and the <strong>in</strong>stallation<br />

and commission<strong>in</strong>g of the entire<br />

plant is scheduled for 2004. By<br />

the end of the year 2004 the power<br />

station has to be on l<strong>in</strong>e. That’s a<br />

big challenge because meet<strong>in</strong>g the<br />

short time schedule will need a lot<br />

of coord<strong>in</strong>ation and flexibility of all<br />

parties <strong>in</strong>volved.<br />

This hydropower station will not only<br />

supply necessary electricity to the local<br />

power grid, it will also improve the<br />

flood protection of the entire region.<br />

This project will also contribute substantially<br />

to the irrigation of the surround<strong>in</strong>g<br />

agricultural area as well as<br />

improvement of navigation on the Liu<br />

river.<br />

Gottfried Seisenbacher<br />

Phone +43/70 6987 2842<br />

gottfried.seisenbacher@vatech-hydro.at<br />

Technical data:<br />

Output: 30.7 MW / 32.6 MVA<br />

Voltage: 10.5 kV<br />

Head: 10.8 m<br />

Speed: 93.75 rpm<br />

Runner diameter: 6,000 mm<br />

Stator diameter: 6,800 mm<br />