17.08.2013 Views

2012 Budget Book.indd - Metra

2012 Budget Book.indd - Metra

2012 Budget Book.indd - Metra

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

36<br />

Capital Program, continued<br />

The <strong>2012</strong>-2016 core capital and State of Illinois<br />

Bond program allocate $218.5 million for station<br />

and parking improvements. Of that total, the State<br />

of Illinois Bond Program will provide resources for<br />

engineering and construction of station improvements<br />

throughout the <strong>Metra</strong> system in the<br />

amount of approximately $135.7 million.<br />

Preventive Maintenance<br />

Optimally, the Capital program is the result of<br />

proactive strategic decisions driven by available<br />

resources, worthy investments, asset preservation<br />

and system longevity.<br />

The potential adverse e ects of diverting capital-<br />

eligible funds to operations repetitively include:<br />

unscheduled repairs that can result in service<br />

delays; deteriorated structural conditions that can<br />

result in slow orders; deteriorated yard conditions<br />

that can result in ine cient maintenance; electronics<br />

obsolescence that can result in slow orders;<br />

and vehicles and equipment utilized beyond their<br />

useful life, which can yield slow response time.<br />

In recent years, <strong>Metra</strong> has relied on funds designated<br />

for preventive maintenance to plug holes in<br />

its operating budget. For <strong>2012</strong> and beyond, capital<br />

eligible funds will no longer be diverted to operating<br />

expenses.<br />

<strong>Metra</strong> Stations:<br />

State Bond Program<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

(a) - Engineering currently underway.<br />

(b) - Senator Collins to secure additional funds required to fully fund<br />

station construction costs.<br />

(c) - $10 million in State budget. Representative Osterman to secure<br />

additional funds required to fully fund station construction costs.<br />

Representative Osterman will also need to secure land. $10M Funding<br />

received thru DECA.<br />

(d) - City designing project- New Station, (<strong>Metra</strong> - Platforms Only)<br />

(e) - To be constructed after Flossmoor Station completed.<br />

Table 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!