PE 4607 AIR BRAKE REBUILDS, MET<br />
This project will implement the Federal Railroad<br />
Administration-mandated rebuilding or replacement<br />
of air brakes on <strong>Metra</strong>’s eet of locomotives,<br />
commuter cars, and electric cars. The rebuilt air<br />
brakes will be used on vehicles being operated on all<br />
carriers and railroads in the <strong>Metra</strong> system. This project<br />
is part of an ongoing program to overhaul major<br />
components on <strong>Metra</strong>’s eet in compliance with<br />
FRA rules and regulations that de ne the required<br />
conditions under which railroad vehicles may be<br />
operated.<br />
TRACK AND STRUCTURE<br />
PE 2112 NORTH LINE BRIDGES, UPR<br />
This project includes the replacement of 22 bridges<br />
on the Union Paci c North Line in Chicago, from<br />
Fullerton Avenue on the south end to Balmoral<br />
Avenue on the north end. These bridges are over<br />
100 years old. They are showing signs of increased<br />
deterioration and have reached the end of their useful<br />
life. These bridges cannot be repaired economically<br />
and must be replaced in order to provide<br />
uninterrupted commuter service.<br />
PE 3332 WOOD DALE GRADE SEPARATION, MWD<br />
This project consists of a feasibility study and a<br />
possible grade separation whereby Irving Park Road<br />
and Wood Dale Road will no longer intersect the<br />
Milwaukee District West Line at grade. In addition,<br />
there may be some adjustments required for<br />
vehicular and pedestrian access to the Wood Dale<br />
commuter station.<br />
PE 4027 RAIL, NCS<br />
This project consists of the installation of rail,<br />
ties and ballast, undercutting, and other capital<br />
improvements on the North Central Service (NCS)<br />
commuter rail line. The installation allows for<br />
more frequent commuter train service and will<br />
reduce con icts between inbound and outbound<br />
passenger and freight trains by creating holding<br />
sites for trains to pass each other.<br />
PE 4228 ROW IMPROVEMENTS, MET<br />
This project consists of cutting and removal of trees<br />
and bushes that hinder or block the right-of-way.<br />
Maintenance of Way crews will also spray weeds<br />
along the right of way. Uncontrolled vegetation<br />
can damage the roadbed and cause the track to<br />
shift. Also included is the burial of overhead cables<br />
in select locations to avoid hindrance by trees and<br />
brush in areas where vegetation cannot be easily<br />
controlled.<br />
PE 4241 RETAINING WALL REHABILITATION, BNSF<br />
This project will provide for the rehabilitation<br />
of retaining walls on the BNSF commuter line.<br />
Retaining wall sections at intermittent locations<br />
along the right-of-way will be rehabilitated. This<br />
work typically includes complete reconstruction<br />
with steel sheet piling, concrete panels, or bin wall<br />
to prevent retaining wall deterioration that can<br />
result in destabilization of the roadbed, and in turn,<br />
lead to track shifting.<br />
PE 4615 TIES AND BALLAST, BNSF<br />
PE 4616 TIES AND BALLAST, MED<br />
PE 4617 TIES AND BALLAST, MWD<br />
PE 4618 TIES AND BALLAST, RID<br />