17.08.2013 Views

2012 Budget Book.indd - Metra

2012 Budget Book.indd - Metra

2012 Budget Book.indd - Metra

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

35 years old and they have long exceeded their useful<br />

life. Replacement parts are not available.<br />

PE 4658 VENTILATION SYSTEM UPGRADE, RID<br />

This project is for replacement of the damaged<br />

ventilation units at the 47th Street location. It also<br />

involves building access, platforms, and stairways in<br />

order to readily maintain existing HVAC equipment.<br />

PE 4659 SIGNAL BATTERY REPLACEMENT, MET<br />

This project consists of the replacement of signal<br />

batteries that have reached the end of their useful<br />

life. They can no longer provide the backup power for<br />

signals required during commercial power failures.<br />

These new batteries will mitigate service disruptions<br />

due to commercial power failures.<br />

PE 4662 CONSTANT WARNING TIME DEVICES, UPR<br />

This project will install Constant Warning Time<br />

Devices for the crossing at Nagle Avenue on the<br />

UPR, along with a number of adjacent crossings.<br />

This project is mandated by the ICC and the list of<br />

crossings for CWTDs has been developed by the ICC.<br />

The UPR, ICC, and IDOT will all be contributing to<br />

the project. Due to the nature of this work, multiple<br />

crossings will be implemented in overlapping phases.<br />

FACILITIES AND<br />

EQUIPMENT<br />

PE 4368 ACCOUNTING SYSTEM UPGRADES, MET<br />

This project will provide funding for <strong>Metra</strong> to<br />

implement additional phases of the Revenue<br />

Accounting System project and to incorporate<br />

any enhancements that are necessary after<br />

implementation. This project will provide<br />

additional funding for its conductor-handheld<br />

pilot project. Any projects that are required to<br />

coordinate with RTA Universal Fare initiatives will<br />

also be funded from this project. This project will<br />

provide funding for <strong>Metra</strong> to scope and prepare an<br />

RFP for replacement of its current nancial systems.<br />

PE 4665 EQUIPMENT & VEHICLES – ENGINEERING,<br />

MET<br />

PE 4668 EQUIPMENT & VEHICLES – MECHANICAL,<br />

MET<br />

These projects provide for the purchase and<br />

rehabilitation of vehicles and equipment to be<br />

utilized by <strong>Metra</strong>’s Engineering and Mechanical<br />

Departments. The vehicles and equipment<br />

purchased will replace various pieces of obsolete<br />

or inadequate support vehicles and equipment<br />

used to help service and maintain <strong>Metra</strong>’s eet at<br />

the various yards. This includes but is not limited to:<br />

supervisory vehicles for supervision of eld work,<br />

small pickup trucks, various forklift trucks, and car<br />

movers. The existing equipment has surpassed its<br />

useful life.<br />

PE 4666 EQUIPMENT – OFFICE, MET<br />

This project involves the purchase of new<br />

and replacement support equipment for use<br />

throughout the <strong>Metra</strong> system. Obsolete support<br />

equipment needs to be replaced in order to<br />

increase productivity and e ciency and decrease<br />

repair costs. Such equipment can include: general<br />

o ce equipment, copiers, personal computers,<br />

servers, mainframe processors, peripheral<br />

equipment, printers, and network devices.<br />

PE 4669 FINANCIAL SYSTEMS REPLACEMENT, MET<br />

This project will provide funding for <strong>Metra</strong> to<br />

implement an Enterprise Resource Planning<br />

61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!