21.08.2013 Views

AP-G84/04 Best practice in road use data collection, analysis ... - WIM

AP-G84/04 Best practice in road use data collection, analysis ... - WIM

AP-G84/04 Best practice in road use data collection, analysis ... - WIM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Accessed by AR - ARRB TRANSPORT RESEARCH on <strong>04</strong> Feb 2005<br />

Aust<strong>road</strong>s 20<strong>04</strong><br />

— 62 —<br />

<strong>Best</strong> Practices <strong>in</strong> Road Use Data Collection, Analysis and Report<strong>in</strong>g<br />

The total VKTi for this region i us<strong>in</strong>g eight strata = ∑ VKT ij = 23,808 × 10<br />

j=<br />

1<br />

3 veh-km<br />

8<br />

∑<br />

j=<br />

1<br />

The summation ij ij SD L = 7,249,267 veh-km<br />

The number of count<strong>in</strong>g stations for each stratum ( N ij ) is calculated us<strong>in</strong>g Equation B1. For<br />

example, Li1 = 94,821 km and SDi1 = 29 veh for j=1 and<br />

N i 1<br />

94,<br />

821×<br />

29<br />

= × 7,<br />

249,<br />

267 = 14.07 or 14 stations<br />

3 2<br />

( 0.<br />

05 × 23,<br />

808 × 10 )<br />

This method has been developed further <strong>in</strong> Botterill and Luk (1998) by <strong>in</strong>clud<strong>in</strong>g accuracy and<br />

statistical significance requirements and relax<strong>in</strong>g the requirement on preset AADT strata. Us<strong>in</strong>g the<br />

orig<strong>in</strong>al method, the number of stations required could be underestimated.<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!