24.08.2013 Views

Hydronic M-II (Water Heater) - Espar

Hydronic M-II (Water Heater) - Espar

Hydronic M-II (Water Heater) - Espar

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Heater</strong> Operation<br />

Parts list for wiring diagram, <strong>Hydronic</strong> M-<strong>II</strong> - 12 Volt / 24 Volt<br />

1.1 Blower motor<br />

1.2 Glow pin I<br />

1.2.1 Glow pin <strong>II</strong> (optional 12 kW)<br />

1.5 Overheating sensor<br />

1.12 Flame sensor<br />

1.13 Temperature sensor<br />

2.1 Control unit<br />

2.2 Fuel metering pump<br />

2.5.7 Relay, vehicle blower (fan)<br />

2.5.18 Relay, changeover water circuit<br />

(To be fitted by customer if required)<br />

2.7 Main fuse 12 volt = 20A<br />

24 volt = 15A<br />

2.7.1 Fuse, control option 5A<br />

2.7.5 Fuse, vehicle blower (fan) 25A<br />

2.12 <strong>Water</strong> pump<br />

5.1 Battery<br />

5.10 Vehicle blower (fan)<br />

a) Connection to 7 day timer, programmable timer, easy start or<br />

push pull switch<br />

b) <strong>Water</strong> circuit change-over: Relay makes contact at 68°C and<br />

breaks contact at 63 °C water temperature (with temperature<br />

drop 58 °C / 45 °C)<br />

c) Temperature drop<br />

x) Disconnect cable<br />

a2) Diagnosis<br />

a3) Switch on signal<br />

a4) Power supply plus<br />

a5) Power supply minus<br />

Connectors and bush holdings are shown from the cable<br />

inlet side.<br />

Connector pin assignment: 12-pin connector (external).<br />

22<br />

PIN-No. Connection<br />

A1 Dosing osing<br />

pump<br />

B1 Solenoid valve, optional<br />

C1 Relay, blower<br />

A2 Battery ( - )<br />

A3 Battery ( + )<br />

B3 TRS signal (ADR)<br />

C3 Temperature drop<br />

B4 Diagnosis<br />

C4 <strong>Heater</strong> ON

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!