October 31, 1975 - Gerald R. Ford Presidential Library and Museum
October 31, 1975 - Gerald R. Ford Presidential Library and Museum
October 31, 1975 - Gerald R. Ford Presidential Library and Museum
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The Brown-Bassett gas field is located in Terrell County, Texas, in<br />
the Val Verde Basin.<br />
The principal producing formation is the Ellenburger dolomite of<br />
Ordovician agr.. The Ellenburger reaches about 1,500 feet in thickness<br />
at Brown-Bassett <strong>and</strong> is encountered at a depth of about 14,000 feet.<br />
There are minor amounts of gas in the Silurian, Pennsylvania-Strawn,<br />
<strong>and</strong> Permian-Wolfcamp Formations.<br />
The structure at Brown-Bassett is a highly faulted anticline. Bottom<br />
water controls the lower limits of production. The Ellenburger productive<br />
area is about 18,000 acres (28 square miles).<br />
The bottom water in the Ellenburger appears limited in its activity<br />
<strong>and</strong> the gas is believed to be produced through the process of pressure<br />
depletion. The raw gas produced is about 54 percent C02 by volume.<br />
Ultimate recovery <strong>and</strong> gas originally in place were estimated by extrapolating<br />
a pressure data versus cumulative production trend to an<br />
ab<strong>and</strong>onment reservoir pressure of 500 psia <strong>and</strong> to a pressure of absolute<br />
zero respectively. The study team encountered several problems<br />
in this analysis which could affect the results. The highly faulted<br />
nature of the Ellenburger structure seriously restricts pressure<br />
communication throughout the field. The average pressure trend for<br />
the reservoir does not extrapolate backwards to the correct original<br />
pressure--the difference being 1,300 psia or about 20 percent.<br />
Accordingly there is some risk that the incorrectly positioned line<br />
might not extrapolate forward to the correct ultimate recovery.<br />
Finally there is a problem of water production in the Ellenburger<br />
gas stream, which was not investigated because of time restrictions.<br />
The FEA report on the Brown-Bassett Field was prepared by the U.S.<br />
Bureau of Mines, Department of Interior, under Interagency Agreement<br />
CG-05-50058-00.<br />
20