24.10.2013 Views

October 31, 1975 - Gerald R. Ford Presidential Library and Museum

October 31, 1975 - Gerald R. Ford Presidential Library and Museum

October 31, 1975 - Gerald R. Ford Presidential Library and Museum

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Individual weil deliverability is determined from well test data.<br />

The wells are flowed approximately 72 hours into the pipeline while<br />

maintaining a working well head pressure at 80 percent of the<br />

average shut-in well head pressure of the field. The study team<br />

has estimated that the field could produce at the deliverabiljty<br />

rate on a continuous basis without significant loss of ultimate<br />

recovery_ The December 1974 production is about one-half of<br />

deliverability as shown below:<br />

December 1974<br />

Production Deliverability<br />

State (MMCF/D) (MMCF/D) Ratio<br />

Kansas 1,960 4,596 0.43<br />

Oklahoma 399 321 1.24'<br />

Texas 242 347 0.70<br />

Total 2,601 5,264 0.49<br />

The FEA report on the Hugoton field was prepared by the U.S. Bureau<br />

of Mines, Department of the Interior, under Interagency Agreement<br />

CH-05-50058-00.<br />

93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!