October 31, 1975 - Gerald R. Ford Presidential Library and Museum
October 31, 1975 - Gerald R. Ford Presidential Library and Museum
October 31, 1975 - Gerald R. Ford Presidential Library and Museum
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Individual weil deliverability is determined from well test data.<br />
The wells are flowed approximately 72 hours into the pipeline while<br />
maintaining a working well head pressure at 80 percent of the<br />
average shut-in well head pressure of the field. The study team<br />
has estimated that the field could produce at the deliverabiljty<br />
rate on a continuous basis without significant loss of ultimate<br />
recovery_ The December 1974 production is about one-half of<br />
deliverability as shown below:<br />
December 1974<br />
Production Deliverability<br />
State (MMCF/D) (MMCF/D) Ratio<br />
Kansas 1,960 4,596 0.43<br />
Oklahoma 399 321 1.24'<br />
Texas 242 347 0.70<br />
Total 2,601 5,264 0.49<br />
The FEA report on the Hugoton field was prepared by the U.S. Bureau<br />
of Mines, Department of the Interior, under Interagency Agreement<br />
CH-05-50058-00.<br />
93