Meuse. The areas where these calculations are currently possible are also more than 90% of the actual project<br />
area of Room for the River and all of the project area for the Meuse Works. In the delta’s it is only possible to<br />
evaluate the influence of climate change on dike heights in the 2001 situation and to evaluate the influence of<br />
climate change and the project proposal on design water levels in the situation in 2015. New water level data for<br />
the situation after completion of the project proposal for the Room for the River project have to be generated<br />
first. There is no technical problem, to carry this out.<br />
Examples of climate change are shown individually: sea level rise, a change in the design discharge and changes<br />
in wind speeds at design conditions. For the Rhine Branches and Meuse, the situation of design water levels and<br />
the probability of dike failure for a number of dike rings in 2001 will be shown as a reference. Then for the Rhine<br />
Branches the influence of a slight change in the design discharge, wind speeds at design conditions is illustrated<br />
together with the effects of the Room for Rivers program. Differences of design water levels and the<br />
probability of dike failure are shown for a number of scenario’s.<br />
The 2001 situation will be compared to the situation in 2015 after completion of the Room for the River project,<br />
with and without climate change on the Rhine Branches. On the Meuse the 2001 situation will be compared to<br />
the situation in 2015 after completion of the Meuse Works and Room for the River project, with and without<br />
climate change. In the Meuse Works two retention reservoir areas are part of the project proposal. The effect of<br />
the retention area, Lob van Gennep will also be evaluated separately.<br />
There are more than 25 dike rings in the project area for the Room for the River project and 40 for the Meuse<br />
Works project. Information to evaluate dike sections has been generated every 100 meters, so in total there are<br />
more than 10 000 dike sections. For the situation in 2001 and the situation in 2015 all dike sections will evaluated.<br />
To demonstrate the influence of climate change a selection shall be made, to illustrate that the Hydramodels<br />
really work. So elaborate results for only two dike rings shall be shown per project.<br />
Conclusions, which can be drawn at the moment on the basis of current calculations:<br />
After completion of the Room for the River project in 2015 10 % of dikes still have to be reinforced to meet the<br />
minimum safety levels. If climate change is taken into account a lot more has to be done in the near future especially<br />
if no flooding occurs along the Rhine in Germany.<br />
For the Meuse one can conclude that on the basis of the current project proposal, one of the project objectives,<br />
no rise in design water levels in the downstream areas will not be met. Additional measures in the Meuse Works<br />
project will have to be taken.<br />