Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix 6<br />
Testing procedure<br />
RMV-112D:<br />
Setting: HYST: 0%<br />
Undervoltage: 90% - 5 s<br />
Overvoltage: 110% - 5 s<br />
Connect nominal supply voltage:<br />
Connect nominal measuring voltage in<br />
delta or star coupling:<br />
Set measuring voltage to 80%:<br />
Set measuring voltage to 120%:<br />
Green “<strong>Power</strong>” LED is lit.<br />
Yellow U< and U> LEDs are not lit.<br />
Yellow U< LED is lit immediately, red U< LED for the relay is lit and the relay is<br />
activated after 5 s.<br />
Yellow U> LED is lit immediately, red U> LED for the relay is lit and the relay is<br />
activated after 5 s.<br />
RMV-122D:<br />
Setting: HYST: 0%<br />
Overvoltage1: 110% - 5 s<br />
Overvoltage2: 110% - 5 s<br />
Connect nominal supply voltage:<br />
Connect nominal measuring voltage in<br />
delta or star coupling:<br />
Set measuring voltage to 120%:<br />
Green “<strong>Power</strong>” LED is lit.<br />
Yellow U>1 and U>2 LEDs are not lit.<br />
Yellow U>1 and U>2 LEDs are lit immediately, red U>1 and U>2 LEDs for the<br />
relays are lit and the relays are activated after 5 s.<br />
RMV-132D:<br />
Setting: HYST: 0%<br />
Undervoltage1: 90% - 5 s<br />
Undervoltage2: 90% - 5 s<br />
Connect nominal supply voltage:<br />
Connect nominal measuring voltage in<br />
delta or star coupling:<br />
Set measuring voltage to 80%:<br />
Green “<strong>Power</strong>” LED is lit.<br />
Yellow U