- Page 1 and 2:
Interactive Design Study Cluster Le
- Page 3 and 4:
• Interactive Design Study | Ront
- Page 5 and 6:
MINISTRY OF MSME MSMEs. The total s
- Page 7 and 8:
IIE • The approach of the Indian
- Page 9 and 10:
POIRANGA AND ADJOINING AREAS OF •
- Page 11 and 12:
• Palashbari: The old Palashbari
- Page 13 and 14:
• Boko: Boko is also a trading ce
- Page 15 and 16:
The last 100 years have seen the gr
- Page 17 and 18:
POIRANGA located in South Kamrup Di
- Page 19 and 20:
THE HANDLOOM SECTOR IN INDIA- A RET
- Page 21 and 22:
• At the time of independence, th
- Page 23 and 24:
• strategic interventions to enab
- Page 25 and 26:
• The Master wavers Decades back,
- Page 27 and 28:
• Contribution of Women Weavers:
- Page 29 and 30:
• The self-sufficient weaver spen
- Page 31 and 32:
Life cycle of silk worms has four s
- Page 33 and 34:
Rearing schedule for eri silkworm:
- Page 35 and 36:
• Autumn season: 5 th batch Septe
- Page 37 and 38:
De-gumming of eri cocoons: Cocoon c
- Page 39 and 40:
Eri is not a continuous filament an
- Page 41 and 42:
Charka type spinning machine The ch
- Page 43 and 44:
• Spinning on a `takli` also brin
- Page 45 and 46:
6 Season for raising plantation Cas
- Page 47 and 48:
• 1. Procurement of raw material:
- Page 49 and 50:
Eri culture: The silk produced by P
- Page 51 and 52:
Raw Material: The basic raw materia
- Page 53 and 54:
eakthrough in terms of requirement
- Page 55 and 56:
Market size and destination: Design
- Page 57 and 58:
mainly Nepal from where it is marke
- Page 59 and 60:
• Some weavers directly sell the
- Page 61 and 62:
• If there are any significant co
- Page 63 and 64:
It is in relation to the external b
- Page 65 and 66:
3 Master Weavers earning between Rs
- Page 67 and 68:
Branding and effective use of Geogr
- Page 69 and 70:
Six treadle and design development
- Page 71 and 72:
DRAFT ACTION PLAN • The strategy
- Page 73 and 74:
Creation of social capital: ● Cre
- Page 75 and 76:
• Unit 2 • Name of the owner: T
- Page 77 and 78:
• Unit 5 • Name of the owner: B
- Page 79 and 80:
• Unit 9 • Name of the owner: R
- Page 81 and 82:
• Unit 13 • Name of the owner:
- Page 83 and 84: • Unit 17 • Name of the owner:
- Page 85 and 86: • Unit 21 • Name of the owner:
- Page 87 and 88: 5. The existing product Makhela-cha
- Page 89 and 90: • Marketing & Designing: • The
- Page 91 and 92: The Resource centers in the state t
- Page 93 and 94: c. Existing status and opportunity
- Page 95 and 96: d. Scope of technology, modernizati
- Page 97 and 98: OPPORTUNITIES: . 1. The production
- Page 99 and 100: g. Details of market and competitio
- Page 101 and 102: h. Study for the need of training a
- Page 103 and 104: j. Packaging and logistics related
- Page 105 and 106: k. Exhibition/ Display design oppor
- Page 107 and 108: l. Study of infrastructure set up f
- Page 109 and 110: CONCLUSION • The visit to Poirang
- Page 111 and 112: • A single family may rear, spin,
- Page 113 and 114: • Weakness & Implications: • 1.
- Page 115 and 116: After Workshop Report DCS MSME Sche
- Page 117 and 118: Interactive Design Study • They a
- Page 119 and 120: DCS MSME Scheme MSME clusters over
- Page 121 and 122: • The attempt of this NAS is to i
- Page 123 and 124: As for the socio-cultural milieu, S
- Page 125 and 126: Design Clinic 5 Band Workshop Repor
- Page 127 and 128: Raw Material: Design Clinic 5 Band
- Page 129 and 130: Design Clinic 5 Band Workshop Repor
- Page 131 and 132: Six treadle and design development
- Page 133: ESSENTIAL ACTION PLAN • The strat
- Page 137 and 138: 5. The existing product Makhela-cha
- Page 139 and 140: Scope of Design Project As the Poir
- Page 141 and 142: * The domestic market for handloom
- Page 143 and 144: Schedule of 5 Day design Workshop u