CONDITION OF THE AREA<br />
In the plot on which to build the hostel, there is not a building need to be<br />
demolished. There is only a small booth installations, but it is not necessary to<br />
demolish for the construction of our building. The only work to be done is<br />
cleaning the site and removing the vegetal layer.<br />
To clean the vegetal layer will be used manually or mechanically, in accordance<br />
with Regulation Technology.<br />
Then the corresponding land transportation will be done with trucks loaded from<br />
the machine until the next landfill site.<br />
Once the place is clean shall be the reformulation of the areas to be excavated,<br />
leaving the witnesses of this rethinking to make the necessary checks at any<br />
time. The drain is made by the mechanical method, it shall take appropriate<br />
measures to prevent damage to public roads, being observed at all times<br />
comply with the regulations. The remaining land will be transported by trucks<br />
from the machine to the dustbin of work.<br />
The ditches and footings will be excavated by mechanical methods following the<br />
criteria of the regulation. The land will be transported from the machine to the<br />
dump along with the work.<br />