María Molina Martín<br />
- They will settle down to a minimum range of 2 m., (like general norm), forts<br />
tops of end of route, for the vehicles that must on the brink of madness come<br />
near the slopes of the drained one, to spill the concrete (Dumper, truck,<br />
concrete mixer).<br />
- The concrete spill in the interior of the formwork one will be made distributing it<br />
throughout the same one uniformly, by regular layers, in avoidance of overloads<br />
props that can deform or burst the formwork.<br />
B2) Norms or preventive measures of application during the concrete process<br />
one of forged pillars.<br />
- Before the beginning of the concrete spill, the Overseer (or Ordered), will<br />
review the good state of the security of the formwork, in accident prevention by<br />
blow-out or I spill.<br />
- Before the beginning of the concrete process, one will review the correct<br />
disposition and state of the networks of protection of the works of structure.<br />
- Forbidden final, to climb up the formworks ones of the pillars or to remain in<br />
balance on such.<br />
- Formworks will be watched good behavior during the spill of the concrete,<br />
paralyzing them at the moment that detects failures. The spill will not be started<br />
again until restoring the decreased stability.<br />
- The chain of closing of the access of – turret or concrete tower – will remain<br />
moored, closing the set whenever on the platform exists some worker.<br />
- The good state of the hollows in the forged one will be reviewed, reinstall – the<br />
covers that lack and nailing the releases, daily.<br />
- The good state of the visors of protection against fall of objects, being solved<br />
will be reviewed daily the deteriorations.<br />
- Accesses easy and safe will be arranged to arrive at the work places.<br />
- Forbidden to concentrate concrete loads in a single point. The spill will be<br />
made extending the concrete with smoothness without abrupt unloading, and in<br />
ample surfaces.<br />
- Movable platforms of minimum of 60 cm. wide will settle down (3 joined planks<br />
to each other), from which they execute the works of vibrated of the concrete.<br />
- Belt roads will settle down on the surfaces to concrete formed by lines of 3<br />
planks of minimum total width of 60 cm.<br />
42