FINAL PROJECT: HOSTEL HALMSTAD-SWEDEN - RiuNet
FINAL PROJECT: HOSTEL HALMSTAD-SWEDEN - RiuNet
FINAL PROJECT: HOSTEL HALMSTAD-SWEDEN - RiuNet
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
María Molina Martín<br />
HEALTH AND SAFETY STUDY<br />
Safety and Health study establishes, during the construction of the work, the<br />
forecasts respect to prevention of risks and occupational accidents so that all<br />
the works that compose this work develop surely, avoiding dangerous actions or<br />
situations by lack of foresight, lack of information on the possible risks or means<br />
insufficiency, as well as the sanitary services common to the workers.<br />
It will serve to give basic directives to the companies’ contractors to carry out<br />
his obligations in prevention field of professional risks taking easy his<br />
development under the control of the Coordinator in Security and Health during<br />
the execution of the work.<br />
A Plan to Emergencies is described in addition that guarantees performance<br />
standards at the time of facing situations of gravity which they could take place<br />
to assure the attendance, evacuation and putting out of danger of the personnel<br />
that works, or is in the work at the moment of the emergency.<br />
The work consists of the construction of a hostel in Styrmansgatan with<br />
Stationsgatan, in Halmstad, Sweden.<br />
The hostel will be located in Halmstad south-west of Sweden, beside the Nissan<br />
River according to graphic in the situation plane.<br />
The site has a surface of 15538 m2 approximately.<br />
Referring to the services, the lot has provision of electrical energy, water supply,<br />
residual water evacuation through formation communications net.<br />
PROMOTER: HOGSKOLAN I <strong>HALMSTAD</strong><br />
BUDGET EXECUTION OF THE <strong>PROJECT</strong>: 1.313.473,56 EUROS<br />
DURATION OF THE BUILD: The works starts on 18/June/2012 and finish on<br />
1/March/2013<br />
NUMBER OF WORKERS ANTICIPATED for the totality of the project will not<br />
surpass the number of 20 workers with different specialties.<br />
32