PRESUPUESTO Y MEDICIONES<br />
Hostel<br />
CÓDIGO RESUMEN UDS LONGITUD ANCHURA ALTURA PARCIALES CANTIDAD PRECIO IMPORTE<br />
CAPÍTULO CHAPTER 2 FOUNDATION<br />
02 01 m2 Cleaning concrete e=10 cm<br />
Cleaning concrete layer HM 15/B/20 prepared, soft consistency, maximum aggregate size 20 mm.<br />
and 10 cm. thickness at the base of the foundation, transported and put into work, according to regulations.<br />
02 02 m3 Reinforced concrete footings<br />
121 3,30 0,30 119,79<br />
70 1,00 1,00 70,00<br />
Concrete HA 30/B/40/IIa prepared, in footings, with an average amount of 30 kg. steel B 500 S, including<br />
cuts, separators, wire bound, vibrating and curing of concrete, including formwork.<br />
02 03 m3 Reinforced concrete beams braced<br />
70 1,00 1,00 0,60 42,00<br />
Reinforced concrete, HA 30/B/20/IIIa + Qb prepared, in braces, with average amount of 30 kg. steel<br />
B 500 S, including cuts, separators, wire bound, vibrating and curing of concrete, including formwork.<br />
121 3,30 0,30 0,40 47,92<br />
189,79 13,26 2.516,62<br />
42,00 204,29 8.580,18<br />
47,92 323,63 15.508,35<br />
TOTAL CAPÍTULO CHAPTER 2 FOUNDATION..................................................................................................... 26.605,15<br />
30 de mayo de 2012 Página 2