02.02.2014 Views

East Mountain Trails & Bikeways Master Plan - Bernalillo County

East Mountain Trails & Bikeways Master Plan - Bernalillo County

East Mountain Trails & Bikeways Master Plan - Bernalillo County

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 3. User Characteristic and Preferences (paved surfaces)<br />

Pedestrians Rollerbladers Road Bicycles<br />

Typical Duration 1 hour to half day Half day half day<br />

Typical Distance 0.5 to 5 miles or more 2 to 10 miles 30-100 miles<br />

Terrain Paved paths, preferably off-road Paved paths, Generally flat or undulating,<br />

off-road<br />

Surface Paved paths, unpaved paths Paved and cleared of ALL debris (sand,<br />

stones)<br />

Hard surface, paved trail or bike lane,<br />

especially on Frost Road and N. 14 to<br />

schools<br />

Paved, signed & striped shoulder,<br />

cleared of debris and surface<br />

impediments<br />

Slope Less than 5 percent generally Flat with small undulations Greater than 5% generally; may exceed<br />

for short distances<br />

Clearance 8 feet 8 feet 10 feet<br />

Track Single track Six-foot wide Paved trails, bike lanes, road shoulders<br />

Facilities Parking, benches Occasional bars to hold onto to stop,<br />

benches along the way<br />

Parking<br />

Key to experience<br />

Connections to desired<br />

destinations, safety from cars,<br />

safety in street crossings<br />

Long routes without obstacles and steep<br />

slopes<br />

Long, fast routes with terrain variability<br />

Obstacles/Issues<br />

Cars, road bikes, poor pavement,<br />

unsafe road crossings<br />

Stones, sand, rocks, debris, steep slopes<br />

Garbage & debris, bad pavement, poor<br />

drivers, pedestrians<br />

Negative Impacts Disturb wildlife Frighten pedestrians, equestrians,<br />

joggers, wildlife; impede traffic when on<br />

roads<br />

Recommendations<br />

Sidewalks or trails near roads that<br />

connect important civic<br />

destinations<br />

Complete paved trail from Vista Grande<br />

north on 14 to <strong>County</strong> Line<br />

Impede cars, frighten pedestrians<br />

Dedicated lanes or signed and striped<br />

shoulders<br />

EAST MOUNTAIN TRAILS AND BIKEWAYS MASTER PLAN Page 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!