A diverse generation portfolio and high reliability levels<br />
delivered a competitive cost of energy<br />
Contracted Wind Peaking<br />
Eraring<br />
Darling Downs<br />
Ladbroke Grove<br />
Quarantine<br />
Roma<br />
Uranquinty<br />
Shoalhaven<br />
Mt Stuart<br />
Cullerin Range<br />
Worsley<br />
Osborne<br />
Bulwer Island<br />
0% 20% 40% 60% 80% 100%<br />
Equivalent Reliability Factor (ERF) Capacity Factor<br />
• Eraring Power Station ERF was 86%<br />
due to fire in transformer of Unit 2<br />
• First of two Mortlake units available<br />
for dispatch in January <strong>2012</strong><br />
- Completion of second unit<br />
expected in second half of<br />
FY<strong>2012</strong><br />
• <strong>Origin</strong> has a portfolio of gas fired<br />
and wind developments providing<br />
future optionality<br />
Option to run generation harder<br />