APLNG‟s CSG to LNG project is underpinned by a long history of<br />

production growth and a large, high quality reserves base<br />

PJ<br />

120<br />

30,000<br />

100<br />

80<br />

25,000<br />

60<br />

20,000 40<br />

30,000<br />

20<br />

25,000<br />

0<br />

20,000<br />

15,000<br />

10,000<br />

15,000<br />

10,000<br />

5,000<br />

5,000<br />

-<br />

-<br />

Jan-Jun<br />

Jul-Dec<br />

<strong>Origin</strong> Share<br />

• APLNG production up 4% on the<br />

prior half year to 52 PJ<br />

• Production capacity from both<br />

operated and non-operated<br />

assets increased to 323 TJ/day<br />

• APLNG currently operates 335<br />

producing wells; a further 48<br />

development wells drilled but<br />

not producing<br />

Estimated<br />

Requirements<br />

estic Gas <strong>Origin</strong> Contract 3C 2C 3P 2P<br />

Ramp and Tail Gas Train 2 Train 1 QCLNG GSA Domestic Gas <strong>Origin</strong> Contract 3C 2C 3P 2P<br />

34 |<br />

Ramp and Tail Gas Train 2 Train 1<br />

QCLNG GSA Domestic Gas <strong>Origin</strong> Contract<br />

3C<br />

2C<br />

3P<br />

2P<br />

APLNG increased 2P reserves by 1,035 PJ to 12,810 PJ and 3P reserves<br />

have increased to 16,022 PJ<br />

Note: Some of APLNG’s CSG reserves and resources are subject to reversionary right.<br />