2012 Half Year Results Media Presentation - Origin Energy
2012 Half Year Results Media Presentation - Origin Energy
2012 Half Year Results Media Presentation - Origin Energy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
APLNG‟s CSG to LNG project is underpinned by a long history of<br />
production growth and a large, high quality reserves base<br />
PJ<br />
120<br />
30,000<br />
100<br />
80<br />
25,000<br />
60<br />
20,000 40<br />
30,000<br />
20<br />
25,000<br />
0<br />
20,000<br />
15,000<br />
10,000<br />
15,000<br />
10,000<br />
5,000<br />
5,000<br />
-<br />
-<br />
Jan-Jun<br />
Jul-Dec<br />
<strong>Origin</strong> Share<br />
• APLNG production up 4% on the<br />
prior half year to 52 PJ<br />
• Production capacity from both<br />
operated and non-operated<br />
assets increased to 323 TJ/day<br />
• APLNG currently operates 335<br />
producing wells; a further 48<br />
development wells drilled but<br />
not producing<br />
Estimated<br />
Requirements<br />
estic Gas <strong>Origin</strong> Contract 3C 2C 3P 2P<br />
Ramp and Tail Gas Train 2 Train 1 QCLNG GSA Domestic Gas <strong>Origin</strong> Contract 3C 2C 3P 2P<br />
34 |<br />
Ramp and Tail Gas Train 2 Train 1<br />
QCLNG GSA Domestic Gas <strong>Origin</strong> Contract<br />
3C<br />
2C<br />
3P<br />
2P<br />
APLNG increased 2P reserves by 1,035 PJ to 12,810 PJ and 3P reserves<br />
have increased to 16,022 PJ<br />
Note: Some of APLNG’s CSG reserves and resources are subject to reversionary right.<br />
Refer to <strong>Origin</strong>’s Management Discussion & Analysis for the half year ended 31 December 2011 for further information