Econamine FG Plus SM<br />

Preliminary Equipment List<br />

Columns and Vessels<br />

Statoil<br />

Contract: A0NL<br />

Date: 04-Apr-2005<br />

Tag No.<br />

Description<br />

Vertical /<br />

Horizontal<br />

Dimensions<br />

Diameter T/T<br />

meter<br />

meter<br />

Design<br />

Press Temp<br />

kg/cm 2 (g) °C<br />

C-100/200/300 Direct Contact Cooler Vertical 13.8 15.9 0.7 125<br />

Material<br />

CS with 0.10"<br />

min 304L<br />

cladding<br />

Comments<br />

Major Ticket Item: Cost = $1,942,605 (per train)<br />

Cost basis: Factored from ano<strong>the</strong>r project.<br />

Internals<br />

304 SS<br />

Major Ticket Item: Cost = $1,948,500 (per train)<br />

Cost basis: Vendor budgetary quote.<br />

C-101/201/301 Absorber Data is Fluor Confidential<br />

Internals<br />

Data is Fluor Confidential<br />

C-102 Stripper Data is Fluor Confidential<br />

Internals<br />

Data is Fluor Confidential<br />

V-100 Overhead Accumulator Data is Fluor Confidential<br />

V-101 A/B<br />

Reboiler Condensate<br />

Drums<br />

Data is Fluor Confidential<br />

V-102<br />

Reclaimer Condensate<br />

Drum<br />

Data is Fluor Confidential