Econamine FG Plus SM<br />

Preliminary Equipment List<br />

Columns and Vessels (continued)<br />

Statoil<br />

Contract: A0NL<br />

Date: 18-Feb-2005<br />

Tag No. Description V/H<br />

Dimensions<br />

Diameter T/T<br />

meter meter<br />

Design<br />

Press Temp<br />

kg/cm 2 (g) °C<br />

Material<br />

Comments<br />

V-103<br />

CO 2 Compressor KO<br />

Drum #1<br />

Vertical 3.4 4.5 3.5 125 316 SS<br />

Cost = $108,700<br />

Cost basis: K-base<br />

V-104<br />

CO 2 Compressor KO<br />

Drum #2<br />

Vertical 2.9 3.9 7.4 125 316 SS<br />

Cost = $86,<strong>800</strong><br />

Cost basis: K-base<br />

V-105<br />

CO 2 Compressor KO<br />

Drum #3<br />

Vertical 2.4 3.4 17.0 125 316 SS<br />

Cost = $90,700<br />

Cost basis: K-base<br />

V-106<br />

CO 2 Compressor KO<br />

Drum #4<br />

Vertical 2.0 3.1 41.6 125 316 SS<br />

Cost = $116,100<br />

Cost basis: K-base<br />

V-107<br />

Reclaimer Waste<br />

Vessel<br />

Data is Fluor Confidential