Econamine FG Plus SM<br />
Preliminary Equipment List<br />
Columns and Vessels (continued)<br />
Statoil<br />
Contract: A0NL<br />
Date: 18-Feb-2005<br />
Tag No. Description V/H<br />
Dimensions<br />
Diameter T/T<br />
meter meter<br />
Design<br />
Press Temp<br />
kg/cm 2 (g) °C<br />
Material<br />
Comments<br />
V-103<br />
CO 2 Compressor KO<br />
Drum #1<br />
Vertical 3.4 4.5 3.5 125 316 SS<br />
Cost = $108,700<br />
Cost basis: K-base<br />
V-104<br />
CO 2 Compressor KO<br />
Drum #2<br />
Vertical 2.9 3.9 7.4 125 316 SS<br />
Cost = $86,<strong>800</strong><br />
Cost basis: K-base<br />
V-105<br />
CO 2 Compressor KO<br />
Drum #3<br />
Vertical 2.4 3.4 17.0 125 316 SS<br />
Cost = $90,700<br />
Cost basis: K-base<br />
V-106<br />
CO 2 Compressor KO<br />
Drum #4<br />
Vertical 2.0 3.1 41.6 125 316 SS<br />
Cost = $116,100<br />
Cost basis: K-base<br />
V-107<br />
Reclaimer Waste<br />
Vessel<br />
Data is Fluor Confidential