Econamine FG Plus SM<br />

Preliminary Equipment List<br />

Pumps<br />

Statoil<br />

Contract: A0NL<br />

Date: 04-Apr-2005<br />

Tag No.<br />

Description<br />

Pump Type<br />

Operating Diff. Hyd. Spec.<br />

Material<br />

Flow Head <strong>Power</strong> Grav.<br />

m 3 /hr m kW @ PT Impeller Casing<br />

Comments<br />

P-100/200/300 A/B DCC Circulating Water Pump Centrifugal 2,652 35.6 280.1 0.99 316L SS 316L SS<br />

P-101/201/301 A/B DCC Filter Pumps Centrifugal 105 53.7 15.5 0.99 CS CS<br />

Cost = $353,010 (per train)<br />

Cost basis: Factored from ano<strong>the</strong>r project.<br />

Cost = $36,330 (per train)<br />

Cost basis: Factored from ano<strong>the</strong>r project.<br />

Class S-4, if CS construction<br />

P-103/203/303 A/B Rich Solvent Pump Data is Fluor Confidential<br />

P-104 A/B/C Lean Solvent Pump Data is Fluor Confidential<br />

P-105 A/B Reflux Pump Data is Fluor Confidential<br />

P-106/206/306 A/B Wash Water Cooler Pump Data is Fluor Confidential<br />

P-107 Solvent Make-up Pump Data is Fluor Confidential<br />

P-108 Solvent Charge Pump Data is Fluor Confidential<br />

P-109 A/B<br />

Reboiler A/B Condensate<br />

Pump<br />

Data is Fluor Confidential