<strong>Silver</strong> <strong>Creek</strong> <strong>Water</strong>shed TMDL Final Report<br />

Reach<br />

Above Park City<br />

(Empire Canyon)<br />

Park City to<br />

Richardson Flat<br />

BMPs Proposed<br />

Slope Protection Stabilization;<br />

Storm Run<strong>of</strong>f Routing; Isolation<br />

Measures<br />

Slope Protection Stabilization;<br />

Storm Run<strong>of</strong>f Routing; Isolation<br />

Measures; <strong>Water</strong> Treatment;<br />

Ordinances<br />

BMP Efficiency (%<br />

contaminant removal) BMP Cost<br />

80 - 100 % $1.17 million*<br />

85 - 99 % $8.33 million to<br />

$9.01 million<br />

Richardson Flat to<br />

Above Atkinson<br />

Above Atkinson to<br />

Atkinson<br />

Storm Run<strong>of</strong>f Routing; Isolation<br />

Measures<br />

Storm Run<strong>of</strong>f Routing; Isolation<br />

Measures<br />

85 – 99 % $101.72 million to<br />

$102.54 million<br />

85 - 100 % $9.58 million to<br />

$9.68 million<br />

Atkinson to Wanship None n/a n/a<br />

*Cost estimate from Draft Empire Canyon EE/CA<br />

n/a = not applicable<br />

Above Park City<br />

Cost estimates for this portion were calculated in the Draft Empire Canyon EE/CA at<br />

approximately $1.7 million.<br />

Park City to Richardson Flat<br />

<strong>Silver</strong> Maple Claim and Flood Plain Tails are included in this section.<br />

The stream reach from Park City to Richardson Flat is approximately 3.4 miles in length.<br />

Isolation <strong>of</strong> the stream would require a pipe culvert or lined ditch/stream channel.<br />

Lined ditch/stream = (3.4 miles)($50/ft) = $897,600.00<br />

or 48” pipe culvert = (3.4 miles)($88/ft) = $1,579,776.00<br />

The BLM proposes to move contaminated tailings from the <strong>Silver</strong> Maple Claim site to an<br />

approved repository. The area containing contaminated soils is approximately 60 acres is size.<br />

Approximately 387,197 cubic yards <strong>of</strong> material would be excavated and moved.<br />

Excavation = (387,197 cu.yd.)($4.00/cu.yd.) = $1,548,788.00<br />

Top soil = (290,398 sq.yd.)($2.60/sq.yd.) = $755,034.80<br />

Excavation and Topsoil Total = $2,303,822.80<br />

Contaminated tailings from the Floodplain Tails site would be moved to an approved repository.<br />

The area containing contaminated soils is approximately 130 acres is size. Approximately<br />

838,927 cubic yards <strong>of</strong> material would be excavated and moved.<br />

Excavation = (838,927 cu.yd.)($4.00/cu.yd.) = $3,355,708.00<br />

Top soil = (629,195 sq.yd.)($2.60/sq.yd.) = $1,635,907.00<br />

Page 58