10.04.2014 Views

Silver Creek - Division of Water Quality - Utah.gov

Silver Creek - Division of Water Quality - Utah.gov

Silver Creek - Division of Water Quality - Utah.gov

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Silver</strong> <strong>Creek</strong> <strong>Water</strong>shed TMDL Final Report<br />

Seasonal analysis <strong>of</strong> the data is described in section 4.0. Statistical analysis determined that<br />

bimonthly partitioning <strong>of</strong> the data best reflects the seasonal nature <strong>of</strong> the data.<br />

VII. TMDL<br />

(See Section 8.0 for details)<br />

Table 12 provides the zinc and cadmium allocations for each key monitoring station in the <strong>Silver</strong><br />

<strong>Creek</strong> <strong>Water</strong>shed. The reduction needed for each <strong>of</strong> the key stations varies from 48% to 86% for<br />

zinc and 31% to 92% for cadmium.<br />

VIII. Allocation<br />

(See Section 8.0 for details)<br />

Section 8.0 and Table 12 include the allocation for zinc and cadmium between non-point<br />

sources, the one point source in the watershed and the margin <strong>of</strong> safety.<br />

Waste Load Allocation calculations are included in Section 8.0 for the <strong>Silver</strong> <strong>Creek</strong> <strong>Water</strong><br />

Reclamation Facility. Effluent limits for zinc (0.30 mg/l) and cadmium (0.0008 mg/l) are<br />

proposed to assure that the hardness adjusted chronic water quality standards used as endpoints<br />

for this TMDL are met in the stream after mixing with wastewater effluent. These effluent limits<br />

will not be required until significant progress is made on the non-point source pollution problems<br />

in the <strong>Silver</strong> <strong>Creek</strong> <strong>Water</strong>shed.<br />

IX. Public Participation<br />

(See Section 12.0 for details)<br />

Section 12.0 provides the description <strong>of</strong> the rather extensive public involvement and<br />

participation for this TMDL. The Upper <strong>Silver</strong> <strong>Creek</strong> <strong>Water</strong>shed Stakeholders Group has held<br />

regular meetings since March 20, 2001. Several public meetings have been held to allow for<br />

public input and comment on this TMDL. A formal 30 day comment period was also provided<br />

for public comment on the draft TMDL.<br />

Page 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!