Competitive Power Ventures, Inc. - Energy Highway
Competitive Power Ventures, Inc. - Energy Highway
Competitive Power Ventures, Inc. - Energy Highway
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
VOLUME II APPENDICES<br />
1.0 EXECUTIVE SUMMARY<br />
1-A SEQR Procedural Information<br />
1-B Expanded Public Participation Plan<br />
4.0 CULTURAL RESOURCES<br />
4-A Correspondence<br />
4-B Cultural Resource Reports<br />
1) A Draft Phase I Archaeology Report, October 2008<br />
2) Architectural Survey Report, October 2008<br />
5.0 VISUAL RESOURCES AND AESTHETICS<br />
5-A Correspondence with Lead Agency Regarding Viewpoint Selection Process<br />
1) Viewpoint Selection Process for Visual Impact Assessment – Photosimulations,<br />
October 2008<br />
2) Documentation of Additional Wawayanda Planning Board Sites, January 23, 2009<br />
5-B DVD of Stack Lighting<br />
6.0 COMMUNITY FACILITIES<br />
6-A Correspondence with Service Providers<br />
7.0 SOCIOECONIMICS AND ENVIRONMENTAL JUSTICE<br />
7-A The Economic and Fiscal Impacts of the Construction of the “Valley <strong>Energy</strong> Center” in<br />
the Town of Wawayanda, Orange County, New York<br />
7-B Orange County Industrial Agency Letter, January 5, 2009<br />
7-C Memorandum - Impacts on Insurability<br />
7-D Consulting Report Proposed Electrical Generating Plant Spagnoli Road, Melville, New<br />
York<br />
7-E Real Estate Value Impact<br />
8.0 TRAFFIC AND TRANSPORTATION<br />
8-A ATR Summaries<br />
8-B Capacity Analysis Summaries<br />
8-C Accident Abstracts<br />
9.0 AIR QUALITY<br />
9-A Air Quality Modeling Protocol (Revised)<br />
PSD and Part 201 Air Permit Application (on CD)<br />
9-B Emissions Tables<br />
9-C Cumulative PM-10 Emissions Inventories<br />
(PSD/Major Sources and Local Sources)<br />
9-D Graphical Plots of Maximum Predicted Project Impacts<br />
xxiv<br />
Table of Contents