Competitive Power Ventures, Inc. - Energy Highway
Competitive Power Ventures, Inc. - Energy Highway
Competitive Power Ventures, Inc. - Energy Highway
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
05/21/2012 16:56 4012727456 LIUNA REGIONAL OFFIC PAGE 01/02<br />
LiUNA!<br />
NEW ENGLAND REGIONAL OFFICE<br />
226 South Main Street * Providence, RI 02903<br />
Phone: (401) 751-5010 • Fax: (401) 561-3340<br />
g'SABIToNi<br />
iiitycrreaurer<br />
May 18, 2012<br />
The Honorable Andrew M. Cuomo<br />
Governor of New York State<br />
NYS State Capitol Building<br />
Albany, NY 12224<br />
Dear Governor Cuomo,<br />
'MIS* to the<br />
1#dittidint<br />
1k1 IRE<br />
LkEY<br />
TIPHARDSON<br />
•<br />
'COLE<br />
PENN<br />
+a tORRE<br />
I am writing to you today on behalf of the membership of the Laborers'<br />
International Union of North America (LIUNA) and all the people of New York to seek<br />
your support for an outstanding energy infrastructure project in the Hudson Valley. This<br />
project should become part of the State's <strong>Energy</strong> Master Plan which you spoke about in.<br />
your 2012 State of the State.<br />
The CPV Valley <strong>Energy</strong> Center is a proposed $900 million, 650 megawatt (MW)<br />
clean, natural gas-powered electric generating facility to be located in the town of<br />
Wa.wayanda, New York, just outside of Middletown in Orange County. If construction<br />
commences by early next year, as planned, this facility can be online as soon as 2016 to<br />
help meet our growing energy demand in the region.<br />
The addition of this clean burning natural gas fired facility to the state's fleet of<br />
generation would serve to enhance both the overall reliability of New York's electric<br />
system, and our environmental profile.<br />
This project certainly fits the vision you put forth as part of the goals and<br />
objectives for the <strong>Energy</strong> <strong>Highway</strong>. It's geographic location makes it an excellent<br />
candidate to help move power into much needed areas, it could conceivably come on-line<br />
in a short period of time since it is almost through the permitting process, and it's<br />
technology is state-of-the-art, The high efficiency of the CPV Valley <strong>Energy</strong> Center's<br />
proposed combined-cycle technology is well proven, along with the environmental<br />
benefits the technology delivers.<br />
Oftftto:<br />
teit, NW<br />
DC<br />
1165<br />
3.20<br />
1072.754<br />
Oti4..arg<br />
Certainly key to LIUNA is the economic benefits that it will bring. Again, you<br />
spoke about the need for jobs and this project would employ hundreds of union workers<br />
during its 30-month construction period.. That would be a tremendous economic boom for<br />
this region at a time when it is sorely needed. The project will also provide more than<br />
$30 million in local tax revenues, with much of that going to help the local school district<br />
which has been hit hard by budget cuts the past few years.<br />
Feel the <strong>Power</strong>