03.05.2014 Views

Installation Manual for SMX Modules - OEM Automatic AB

Installation Manual for SMX Modules - OEM Automatic AB

Installation Manual for SMX Modules - OEM Automatic AB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Installation</strong> <strong>Manual</strong><br />

10.1.3 Two-channel switching output DO0 with external monitoring<br />

For safety applications from Pl d acc. to EN ISO 13849-1 it is recommended or even<br />

demanded to interconnect two complementary outputs as a group to be able to e.g. control 2<br />

external power contactors.<br />

DO0_P<br />

DO0_M<br />

DO1_P<br />

DO1_M<br />

X21<br />

DI1<br />

DI2<br />

DI3<br />

DI4<br />

DI13<br />

DI14<br />

P1<br />

P2<br />

X14<br />

Fig.:<br />

X12<br />

Two-channel switching output DO0 with external monitoring on input 1 as group<br />

feedback<br />

The two external monitoring contacts are switched in series, supplied by the clock signal P1<br />

and read via input 1. Input 1 was chosen as readback input, but any other input can be<br />

assigned <strong>for</strong> this purpose.<br />

For higher requirements you must make sure that at least 1 switching operation must take<br />

place every 24 hours, in order to test the switching ability of the external power contactor.<br />

HB-37350-810-01-10E-EN <strong>SMX</strong> installation manual.doc Page 40 of 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!