08.05.2014 Views

GRAIN DRYER & PARTS BOOK - Opico

GRAIN DRYER & PARTS BOOK - Opico

GRAIN DRYER & PARTS BOOK - Opico

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. NATURAL GAS<br />

Specifications for Natural Gas connections are available from the gas supplier and must be adhered to.<br />

The RAB dryer will require up to 20 psi, depending on locality. Pressure shown is at the dryer. Maximum<br />

Natural Gas volume on the RAB is up to 50 cubic feet per minute.<br />

6. ELECTRICAL CONNECTIONS<br />

Standard equipment for 3 phase operates on 240 volt electric power and requires 125 ampere service.<br />

All wiring suppling the electrical control panel shall be done in compliance with national,l and local wiring codes<br />

by a qualified electrician.<br />

7. MICROPROCESSOR INSTALLATION<br />

1. Connect cable (6) to rear of the microprocessor box (1). A polarized screw connector locks the<br />

cable into place.<br />

2. Mount the microprocessor box (1) to the right front power frame unit by threading the plastic<br />

adjusting knobs (3) through mounting brackets (2) and (13) and into the microprocessor box.<br />

3. Adjust the microprocessor box to a convenient angle to reduce glare and improve readability.<br />

Tighten adjusting knobs.<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!