9. SERVICING AND CARE OF AGITATOR<br />
It is important that the agitator be inspected before and after the first load. Then after each 100 hours<br />
of operation.<br />
A. The tapered agitator rollers must support the plate sprocket so there is no horizontal movement<br />
of sprocket.<br />
The RAB has four rollers mounted on the agitator sprocket so each roller supports an equal load.<br />
These rollers are tapered so all horizontal and vertical slack may be taken up.<br />
B. Adjusting Rollers<br />
1. Secure the cam nut and loosen the bolt<br />
2. Rotate the cam nut counter-clockwise (when looking down into the cam nut) while holding<br />
the bolt stationary.<br />
3. Secure the cam nut and tighten the bolt.<br />
4. All cam nuts must be rotated an equal amount so the agitator sprocket remains true.<br />
5. Rotate agitator arms by hand and check clearance.<br />
NOTE: Agitator drive chain is provided with a spring loaded idler, however, it is necessary to<br />
periodically check the slack.<br />
DANGER<br />
Do not open inspection door or enter machine while in operation. Failure to do so may result in serious<br />
injury or death.<br />
10. BELT TENSION<br />
With machine running at normal speed, belts should be tight enough to keep out the slack. Keep belts<br />
tight to prolong life.<br />
11. VAPORIZER (Propane Only)<br />
The vaporizer is designed for year round operation. The vapor plumbing under normal conditions<br />
should be operating at a temperature of approximately 120F to 140F. The temperature may be checked by<br />
placing your bare hand on the plumbing and will range from warm to hot.<br />
Check propane tank for liquid withdrawal. Vapor withdrawal will cause overheating of the vaporizer and<br />
possible damage to the controls. If the vaporizer has been overheated, causing possible rupture, you will be<br />
unable to control the plenum temperature.<br />
WARNING<br />
The vaporizer pipe should be inspected every season for pitting and heat damage. Replace<br />
IMMEDIATELY if any damage is found.<br />
12. CHECK OUT — BEFORE LOADING<br />
All piping and burners have been checked and test fired at the factory. It is possible, however, that<br />
some of the connections may have been loosened or damaged during shipment. After connecting supply tank<br />
to dryer all connections should be tested under pressure with gas pressure on. Tractor can then be started and<br />
dryer test run before loading with grain.<br />
DANGER<br />
Check with liquid soap solution, never with flame. Failure to do so may result in serious injury or death.<br />
13