<str<strong>on</strong>g>Scop<strong>in</strong>g</str<strong>on</strong>g> Missi<strong>on</strong> <strong>on</strong> Rwanda for Embassy of the K<strong>in</strong>gdom of the Netherlands, Kigali<br />
Thursday 11 th ,August, 2011: MINAGRI, 9.00 a.m.<br />
On Thursday, we met MINAGRI, the chairman of the irrigati<strong>on</strong> task force Jean Jacques Mb<strong>on</strong>igaba.<br />
He specifically expla<strong>in</strong>ed the achievement of the task force:<br />
- They now have an irrigati<strong>on</strong> master plan for the whole country;<br />
- District irrigati<strong>on</strong> master plan;<br />
However, he emphasized <strong>on</strong> the lack of the irrigati<strong>on</strong> policy as well as strategic acti<strong>on</strong> plan.<br />
Currently, they have an ambiti<strong>on</strong> of irrigat<strong>in</strong>g 100,000 ha by 2020; where 35,000 ha will be <strong>on</strong> hillside and<br />
65,000 ha <strong>on</strong> marchlands.<br />
In marchlands they have already irrigated 17,000 ha where 90% of it is for rice cultivati<strong>on</strong>.<br />
Ma<strong>in</strong> d<strong>on</strong>ors <strong>in</strong> the irrigati<strong>on</strong> are for marchlands, through RSSP; it 100% WB funded where for LWH it is 80%<br />
WB funded. Other projects <strong>in</strong> irrigati<strong>on</strong> <strong>in</strong>clude the Irrigati<strong>on</strong> project <strong>in</strong> Bugesera which is funded by the<br />
AfDB, Irrigati<strong>on</strong> project of Gatsibo funded by IFAD and another irrigati<strong>on</strong> project for Bugesera which is<br />
fudned by Lux Development.<br />
Beside d<strong>on</strong>ors, the government of Rwanda too, is <strong>in</strong>vest<strong>in</strong>g heavily <strong>in</strong> the irrigati<strong>on</strong> sector where 40% of the<br />
nati<strong>on</strong>al budget is for irrigati<strong>on</strong> <strong>on</strong> both marchlands and hillsides.<br />
Currently there are hillsides irrigati<strong>on</strong> projects <strong>in</strong> Kirehe and Nyagatare for 1,000 ha, funded by the<br />
government, where <strong>water</strong> for irrigati<strong>on</strong> will comes from lakes.<br />
In regards to Marchlands, they are now fund<strong>in</strong>g the development of 2,000 ha <strong>on</strong> small marchlands <strong>in</strong> 11<br />
districts.<br />
Each irrigati<strong>on</strong> project small or big goes hands <strong>in</strong> hands with farmers cooperative and <strong>water</strong> users associati<strong>on</strong><br />
establishment.<br />
Specifically <strong>water</strong> users associati<strong>on</strong> is a mandatory as there is even a m<strong>in</strong>isterial decree <strong>in</strong> that regards. In the<br />
near future, they will even be represented at m<strong>in</strong>isterial level.<br />
It is well developed <strong>in</strong> such way that they are even be<strong>in</strong>g registered by the M<strong>in</strong>istry of Justice before be<strong>in</strong>g<br />
operati<strong>on</strong>al.<br />
Thursday 11 th ,August, 2011: NBI-NELSAP, 10.30 a.m.<br />
We also met Emmanuel Olet, the eng<strong>in</strong>eer <strong>in</strong> charge of <strong>water</strong> resource management department under the<br />
NBI-NELSAP; which has expla<strong>in</strong>ed to us the transboundary acti<strong>on</strong> <strong>on</strong> the Rwandan side.<br />
Several studies <strong>in</strong>clud<strong>in</strong>g navigability studies <strong>on</strong> AKagera, Integrated river bas<strong>in</strong> management and<br />
development strategy for Akagera river were developed.<br />
Reports of those different studies are available.<br />
Thursday 11 th ,August, 2011: EWSA, 11.30 a.m.<br />
We met the director general of EWSA, Yves Muyange, who shortly expla<strong>in</strong>ed the <strong>water</strong> sector under EWSA.<br />