Guideline for the Preparation of Environmental Management Plans
Guideline for the Preparation of Environmental Management Plans
Guideline for the Preparation of Environmental Management Plans
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Environmental</strong> <strong>Management</strong> Plan <strong>Guideline</strong><br />
Approval or Consent<br />
Proponent’s Decision to<br />
Proceed<br />
EIA Documents<br />
(EIS, REF, SEE, etc.)<br />
Approval or Consent<br />
Conditions<br />
O<strong>the</strong>r Licences or<br />
Approvals<br />
Detailed design<br />
Construction<br />
<strong>Environmental</strong><br />
<strong>Management</strong> Plan<br />
Operation <strong>Environmental</strong><br />
<strong>Management</strong> Plan<br />
Operating Plan<br />
Agency and Community<br />
Consultation<br />
CEMP Approval<br />
(if required)<br />
Construction and CEMP<br />
Implementation<br />
Monitor and Audit<br />
<strong>Environmental</strong><br />
Per<strong>for</strong>mance<br />
Continual Improvement<br />
Continual Improvement<br />
OEMP Approval<br />
(if required)<br />
Operation and OEMP<br />
Implementation<br />
Monitor and Audit<br />
<strong>Environmental</strong><br />
Per<strong>for</strong>mance<br />
Agency and Community<br />
Consultation<br />
CEMP Review and Update<br />
OEMP Review and Update<br />
POST-APPROVAL EMP PROCESS<br />
A-1 | DIPNR