<strong>Environmental</strong> <strong>Management</strong> Plan <strong>Guideline</strong><br />

<strong>Environmental</strong> <strong>Management</strong> Controls Person Responsible Completed (Initials/Date) Reference / Notes<br />

Water Quality<br />

Prepare a Soil and Water <strong>Management</strong> Plan (SWMP) be<strong>for</strong>e commencing work.<br />

The SWMP shall provide <strong>for</strong>:<br />

- <strong>the</strong> prompt completion <strong>of</strong> works relating to drainage and sediment control<br />

to minimise exposure time <strong>of</strong> disturbed areas<br />

- <strong>the</strong> provision <strong>of</strong> sediment and filter traps, in advance <strong>of</strong> and in conjunction<br />

with earthworks operations, to prevent contaminated run-<strong>of</strong>f leaving <strong>the</strong><br />

site, and<br />

- scour protection/energy dissipation measures in drainage lines below<br />

drainage outlets.<br />

All controls are to be designed and installed in accordance with Managing<br />

Urban Stormwater: Soil and Construction, Department <strong>of</strong> Housing 1998. This<br />

plan is implemented and maintained <strong>for</strong> <strong>the</strong> period <strong>of</strong> quarrying and subsequent<br />

rehabilitation.<br />

Ensure erosion and sedimentation control measures are installed be<strong>for</strong>e<br />

commencing land disturbance, and remain in place until <strong>the</strong> erosion hazard<br />

reverts to its pre-existing level.<br />

Hazard <strong>Management</strong><br />

Ensure storage areas <strong>for</strong> fuels, oils and chemicals on-site:<br />

- comply with <strong>the</strong> requirements <strong>of</strong> relevant authorities<br />

- are surrounded by impervious bund walls to contain 120% <strong>of</strong> <strong>the</strong><br />

maximum possible spillage volume<br />

- are not within 20 metres <strong>of</strong> any areas <strong>of</strong> concentrated water flows, or<br />

poorly drained areas, and<br />

- are not within <strong>the</strong> drip line <strong>of</strong> trees.<br />

An emergency procedure <strong>for</strong> chemical spills and o<strong>the</strong>r potential incidents shall<br />

be developed be<strong>for</strong>e work commences.<br />

Ensure hydrophobic material, <strong>for</strong> <strong>the</strong> mopping up <strong>of</strong> any hydrocarbons in <strong>the</strong><br />

event <strong>of</strong> a spill, is stored on-site and that relevant personnel are trained in its<br />

use.<br />

<strong>Environmental</strong> Manager EIS Section 5.16<br />

Approval Condition 105<br />

Site Supervisor EIS Section 5.16<br />

Site Supervisor EIS Section 5.19<br />

Site Supervisor EIS Section 5.19<br />

Site Supervisor EIS Section 5.19<br />

D-10 | DIPNR