<strong>Environmental</strong> <strong>Management</strong> Plan <strong>Guideline</strong><br />

<strong>Environmental</strong> <strong>Management</strong> Control<br />

Person<br />

Responsible<br />

Timing / Frequency<br />

Completed<br />

(Initials/Date)<br />

Reference / Notes<br />

Air Quality<br />

To prevent dust emissions from vehicles ensure that all vehicles<br />

entering or leaving <strong>the</strong> site and carrying a load that may generate<br />

dust are covered to prevent dust emissions at all times, except<br />

during loading and unloading.<br />

Site Supervisor<br />

Ongoing during<br />

operations<br />

Consent Condition 3.6<br />

Install, operate, and maintain dust control measures and/or<br />

equipment on <strong>the</strong> following:<br />

- all processing equipment<br />

- internal haul roads and disturbed areas<br />

- truck loading areas, and<br />

- all stockpiles including raw material, product, topsoil, and<br />

overburden.<br />

Site Supervisor<br />

Ongoing during<br />

operations<br />

Consent Condition 3.7<br />

Ensure a mobile water tanker equipped with a pump and sprays is<br />

used to suppress dust from unsealed roads when in use.<br />

Site Supervisor<br />

Ongoing during<br />

operations<br />

Consent Condition 3.8<br />

Flora and Fauna<br />

Fence <strong>the</strong> boundary <strong>of</strong> <strong>the</strong> construction zone to prevent<br />

construction plant and equipment entering adjacent vegetated<br />

areas.<br />

Site Supervisor<br />

Be<strong>for</strong>e commencing<br />

work<br />

EIS Section 4.7.1<br />

Restrict <strong>the</strong> removal <strong>of</strong> trees and o<strong>the</strong>r vegetation to <strong>the</strong> minimum<br />

required <strong>for</strong> quarry activities, <strong>the</strong> processing plant, and areas<br />

necessary <strong>for</strong> fire control.<br />

Site Supervisor<br />

Ongoing during<br />

operations<br />

EIS Section 4.7.1,<br />

Consent Condition 3.11<br />

Rehabilitate and revegetate works <strong>of</strong> extracted strips<br />

progressively.<br />

Site Supervisor<br />

Ongoing during<br />

operations<br />

EIS Section 4.7.1,<br />

Consent Condition 3.12<br />

Establish a riparian zone, revegetated with local native species,<br />

along <strong>the</strong> length <strong>of</strong> <strong>the</strong> reconstructed ephemeral waterway in <strong>the</strong><br />

quarry.<br />

<strong>Environmental</strong><br />

Manager<br />

Post-quarrying<br />

activities<br />

EIS Section 4.7.1,<br />

Consent Condition 3.17<br />