25.05.2014 Views

Guideline for the Preparation of Environmental Management Plans

Guideline for the Preparation of Environmental Management Plans

Guideline for the Preparation of Environmental Management Plans

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Environmental</strong> <strong>Management</strong> Plan <strong>Guideline</strong><br />

<strong>Environmental</strong> <strong>Management</strong> Control<br />

Person<br />

Responsible<br />

Timing / Frequency<br />

Completed<br />

(Initials/Date)<br />

Reference / Notes<br />

Noise<br />

Ensure activities are restricted to <strong>the</strong> following hours:<br />

- 7:00 am to 6:00 pm Monday to Friday<br />

- 8:00 am to 1:00 pm Saturday<br />

- No work on Sundays or public holidays.<br />

Site Supervisor<br />

Ongoing during<br />

operations<br />

Consent Condition 3.40<br />

Ensure noise from <strong>the</strong> site does not exceed <strong>the</strong> following at any<br />

residence not owned by <strong>the</strong> quarry:<br />

- an L Aeq(15 minute) <strong>of</strong> 44 dB(A) between 7am and 6pm Monday<br />

to Saturday, and<br />

- an L Aeq(15 minute) <strong>of</strong> 37 dB(A) between 6am and 7am Monday<br />

to Saturday;<br />

<strong>Environmental</strong><br />

Manager<br />

Ongoing during<br />

operations<br />

Consent Condition 3.41<br />

Waste <strong>Management</strong><br />

Ensure waste is disposed in compliance with <strong>the</strong> requirements <strong>of</strong><br />

Waste Avoidance and Resource Recovery Act, 2001 at a waste<br />

facility licensed to accept <strong>the</strong> type <strong>of</strong> waste presented.<br />

Site Supervisor<br />

Ongoing during<br />

operations<br />

EIS Section 4.11.1<br />

D-6 | DIPNR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!