19.06.2014 Views

Tana Delta Irrigation Project, Kenya: An Environmental Assessment

Tana Delta Irrigation Project, Kenya: An Environmental Assessment

Tana Delta Irrigation Project, Kenya: An Environmental Assessment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rehabilitation of the <strong>Tana</strong> <strong>Delta</strong> <strong>Irrigation</strong> <strong>Project</strong>, <strong>Kenya</strong>: <strong>An</strong> <strong>Environmental</strong> <strong>Assessment</strong>.<br />

Fig. 1: The problem tree: identified constraints to livelihood<br />

Lack of<br />

assets /<br />

capital<br />

Lack of<br />

education /<br />

training<br />

Poor<br />

productivity<br />

Hunger<br />

Ill health<br />

Rice paddy<br />

flooding by<br />

TDIP<br />

POVERTY<br />

Lack of adequate<br />

food supply<br />

Lack of<br />

income<br />

Lack of alternative<br />

income sources<br />

Diminished coping<br />

mechanisms<br />

Lack of surplus<br />

production<br />

Inability to<br />

access markets<br />

Lack of<br />

development<br />

Lack of<br />

cultivable<br />

land<br />

Low crop<br />

productivity<br />

Increased<br />

reliance on<br />

common<br />

Increased<br />

use of<br />

common<br />

b<br />

Population<br />

pressure<br />

Land<br />

annexed<br />

by TDIP<br />

Lack of<br />

storage<br />

Lack<br />

of<br />

market<br />

Lack of<br />

transport<br />

High crop<br />

loss to pests,<br />

ildlif<br />

Insufficient,<br />

unreliable<br />

rainfall<br />

Lack of<br />

seasonal<br />

flooding<br />

Lack of<br />

improved<br />

methods<br />

Lack of<br />

capital<br />

Insecurity<br />

banditry)<br />

Lack of<br />

land<br />

security<br />

Population<br />

pressure<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!