01.07.2014 Views

Air Mobility Plan, 2008 - The Black Vault

Air Mobility Plan, 2008 - The Black Vault

Air Mobility Plan, 2008 - The Black Vault

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Under the capabilities-based planning (CBP) construct, our functional capabilities team (FCT)<br />

conducted a functional area analysis (FAA). From there, the FCT conducted a functional needs<br />

analysis (FNA). Functional solutions analysis (FSA) is a continuous process, and our FCT remains<br />

fully engaged. Together with efforts of ACC/A3 as the <strong>Air</strong> Force IO lead command, AMC/A3 is<br />

leveraging common AF IO needs for the MAF as MAF IO lead.<br />

Milestones<br />

(b)(5)<br />

Information Operations Roadmap<br />

Information Ops<br />

Deficiencies/Solutions<br />

MAF<br />

Deficiencies/Solutions<br />

Reference<br />

Documents<br />

FOR OFFICIAL USE ONLY (FOUO)<br />

OCT 07 113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!